# The Offshore Installations (Safety Zones) Order 2019, Part 2: Installations not stationed at the time this Order is made

Extent: E+W+S+N.I.

(1) Name or other designation
(2) Latitude
(3) Longitude
Alligin Well AP01, Block 204/20a, Alligin Field
60°22.333'N
04°11.631'W
Cook water injection well, Block 21/20a, Cook Field
57°21.54'N
00°49.98'E
DC6 Manifold Structure, Block 211/13a, Penguins Field
61°37.77'N
01°29.59'E
DC7 Manifold Structure, Block 211/13a, Penguins Field
61°36.72'N
01°32.66'E
DC8 Manifold Structure, Block 211/13a, Penguins Field
61°38.98'N
01°29.32'E
DC9 Manifold Structure, Block 211/8, Penguins Field
61°40.28'N
01° 29.02'E
Brodgar (H4) Subsea, Block 21/3a, Brodgar Field
57°55.373'N
0°27.216'E

---
Source: https://www.legislation.gov.uk/uksi/2019/446/schedule/part/2 (the official version)
Page: https://openlegislation.uk/offshore-installations-safety-zones-order-2019/schedule/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

