# The Oil and Gas Authority (Carbon Storage and Offshore Petroleum) (Specified Periods for Disclosure of Protected Material) Regulations 2025, Regulation 12: Geotechnical information in a storage permit application


(1) The OGA or a subsequent holder may publish geotechnical information in a storage permit application after the earlier of—
(a) the period of five years beginning with the date on which injection at the relevant storage site commences, and
(b) the date on which a determination event occurs in respect of the relevant CS licence.
(2) In paragraph (1)—
“geotechnical information in a storage permit application” means information which—
(a) has been included in an application for a storage permit under regulation 6 of the 2010 Licensing Regulations,
(b) relates to—
(i) the geotechnical engineering or analysis required to carry out the activities described in the application, or
(ii) the geology of the area to which the application relates, and
(c) is not information to which regulation 5 applies;
“relevant storage site” means, in relation to geotechnical information which has been included in an application for a storage permit under regulation 6 of the 2010 Licensing Regulations, the storage site in respect of which the application was made.

---
Source: https://www.legislation.gov.uk/uksi/2025/1379/regulation/12 (the official version)
Page: https://openlegislation.uk/oil-and-gas-authority-carbon-storage-and-offshore-petroleum-specified-periods-for-disclosure-of-protected-material-regulations-2025/regulation-12
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

