# The Oil and Gas Authority (Carbon Storage and Offshore Petroleum) (Specified Periods for Disclosure of Protected Material) Regulations 2025, Regulation 8: Consolidated injection and production information


(1) The OGA or a subsequent holder may publish consolidated injection and production information for a storage site or storage complex after the earlier of—
(a) the end of the period of two months beginning with the last day of the month to which that information relates,
(b) the date on which a determination event occurs in respect of the relevant CS licence, and
(c) the date on which the information is included in the CS register.
(2) In paragraph (1), “consolidated injection and production information for a storage site or storage complex” means injection and production information for a storage site or storage complex consolidated on the basis of the calendar month and the well to which it relates.

---
Source: https://www.legislation.gov.uk/uksi/2025/1379/regulation/8 (the official version)
Page: https://openlegislation.uk/oil-and-gas-authority-carbon-storage-and-offshore-petroleum-specified-periods-for-disclosure-of-protected-material-regulations-2025/regulation-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

