Regulation 13 Amendment of regulation 4 of the Oil and Gas Authority (Fees) Regulations 2016
Regulation 4 (fees payable for consents and pipeline works authorisations) is amended as follows.
In paragraph (1)—
at the end of sub-paragraph (b), omit “or”;
after sub-paragraph (c) insert—
“(d)amend a carbon dioxide storage permit;
(e)review and amend a carbon dioxide storage monitoring plan; or
(f)amend a carbon dioxide storage work programme.”.
In paragraph (2)—
at the end of sub-paragraph (a), omit “or”;
at the start of sub-paragraph (c), omit “or”;
after sub-paragraph (c) insert—
“(d)a consent to get petroleum from a licensed area;
(e)a variation of a consent to get petroleum from a licensed area;
(f)a consent to flare or vent petroleum from a well; or
(g)a variation of a consent to flare or vent petroleum from a well.”.
In the table in paragraph (13), at the end insert—
“
Consent to get petroleum from a licensed area £1,180 Variation of a consent to get petroleum from a licensed area £1,180 Consent to flare or vent petroleum from a well £930 Variation of a consent to flare or vent petroleum from a well £930 ”
For paragraph (15) substitute—
“(15)In this regulation, a “complex application” is an application of the type set out in paragraph (2) and that the OGA considers will require—
(a)in the case of sub-paragraphs (a) to (c) of paragraph (2), more than four days for an officer to determine;
(b)in the case of sub-paragraphs (d) to (g) of paragraph (2), more than two days for an officer to determine.”.