# The Outer Dowsing Offshore Wind Farm Order 2026, Paragraph 7: Detailed offshore design parameters


(1) The maximum number of gravity base structure foundations must not exceed 50 per cent of the total number of wind turbine generators, offshore electrical installations, accommodation platform and offshore artificial nesting structures combined.
(2) No wind turbine generator, offshore transformer substation or offshore accommodation platform forming part of the authorised project is to be erected within the area hatched black and marked “offshore restricted build area” on the works plans, whose coordinates are specified below and shown on the offshore order limits and grid coordinates plan—
Point
Latitude
Longitude
150
53° 34′ 31.492″ N
001° 04′ 32.616″ E
151
53° 36′ 34.077″ N
001° 08′ 26.916″ E
152
53° 39′ 12.689″ N
001° 28′ 43.588″ E
845
53° 33′ 59.545″ N
001° 03′ 36.079″ E
846
53° 33′ 59.382″ N
001° 03′ 35.074″ E
847
53° 34′ 09.033″ N
001° 03′ 52.365″ E
848
53° 34′ 31.223″ N
001° 04′ 32.133″ E
849
53° 36′ 37.559″ N
001° 19′ 54.519″ E
850
53° 38′ 07.792″ N
001° 29′ 20.432″ E
851
53° 34′ 27.499″ N
001° 06′ 28.034″ E

---
Source: https://www.legislation.gov.uk/uksi/2026/138/schedule/1/paragraph/7 (the official version)
Page: https://openlegislation.uk/outer-dowsing-offshore-wind-farm-order-2026/schedule-1/paragraph-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.