# The Palm Paper Mill Generating Station Order 2016, Paragraph 4: Detailed design

Extent: E+W+S

(1) The authorised development must be carried out in accordance with the following plans and documents—
(a) the conceptual surface water drainage system;
(b) the environmental statement;
(c) the existing site layout plan;
(d) the design and access statement;
(e) the land plan and site location plan;
(f) the maximum parameters of works;
(g) the site layout and works plan.
(2) In this Requirement—
“conceptual surface water drainage system” means the document certified by the Secretary of State as the conceptual surface water drainage system under article 13;
“design and access statement” means the document certified by the Secretary of State as the design and access statement under article 13;
“existing site layout plan” means the plan certified by the Secretary of State as the existing site layout plan under article 13;
“maximum parameters of works” means the document certified by the Secretary of State as the maximum parameters of works under article 13.

---
Source: https://www.legislation.gov.uk/uksi/2016/166/schedule/2/paragraph/4 (the official version)
Page: https://openlegislation.uk/palm-paper-mill-generating-station-order-2016/schedule-2/paragraph-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.