# The Perth Harbour Revision Order 1988, Article 3: Power to construct works


(1) Subject to the provisions of this Order the Council may in the district of Perth and Kinross and in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plans and sections construct and maintain the works hereinafter described, together with all necessary and proper works and conveniences connected with or incidental thereto, that is to say:—
Work No. 1 A quay wall of sheet steel piling commencing at the outside of the existing timber cope at the southern end of the existing Berth 1, proceeding thence in a south-south-westerly direction for a distance of 30 metres, thence in a westerly direction for a distance of 10 metres and there terminating, together with an infilling of the bed of the River Tay as impounded by the said wall and the provision of a deck of reinforced concrete thereover and a timber cope at the southern end of the new work.
Work No. 2 The removal of the existing coping and steps at the southern end of the existing Berth 1 and the construction of new steps at the southern end of Berth 1 as extended in terms of Work No. 1 above.
(2) The Council may within the limits of deviation reconstruct, renew and alter temporarily or permanently the works.

---
Source: https://www.legislation.gov.uk/uksi/1989/297/article/3 (the official version)
Page: https://openlegislation.uk/perth-harbour-revision-order-1988/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.