Article 3 Power to carry out works
Subject to the provisions of this Order, the trustees may, in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plans and sections, construct and maintain the following works in the Parish of Peterhead, Aberdeenshire together with all necessary and proper works and conveniences connected therewith or incidental thereto:–
-
Work No.1 A reclamation in North Harbour, consisting of a pier and a dry dock, constructed of reinforced concrete commencing at Point A 26 metres south-south west of the north-east corner of Scott’s Pier, thence extending to Points B, C, D, E and F and terminating at Point G 21 metres south-east of the south-east corner of Scott’s Pier.
-
Work No.2 Dredging in North Harbour to a depth of 5.4 metres below the level of low water within the area commencing at Point A and terminating at Point J 27 metres south-east of the north-east corner of Scott’s Pier.
The trustees may, within the limits of deviation, maintain, renew and alter temporarily or permanently the works.