# The Peterhead Port Authority Harbour Revision Order 2015, Article 23: Permanent stopping up of roads

Extent: S

(1) In connection with the construction of the works, the Authority may permanently stop up and discontinue so much of Alexandra Parade as lies between the points marked P1 and P2 shown on plan A and shall provide a substitute in the position shown on the annexed plan between the points marked P1, P3 and P2 on plan A.
(2) In connection with the construction of the works, the Authority may permanently stop up and discontinue so much of Port Henry Pier as lies between the points marked P4 and P5 on plan A.
(3) Upon the permanent stopping up of that part of the roads referred to in paragraphs (1) and (2) all rights of way, if any, over or along that part of the roads stopped up shall be extinguished and the Authority may appropriate and use the site and soil thereof so far as it is the owner of the same.

---
Source: https://www.legislation.gov.uk/ssi/2015/298/article/23 (the official version)
Page: https://openlegislation.uk/peterhead-port-authority-harbour-revision-order-2015/article-23
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.