Article 6 Power to deviate
In carrying out the works authorised by article 5 (power to construct works) the Authority may—
(a)
in respect of Works Nos. 1, 2, 4 and 5, deviate laterally from the lines or situations of those works as shown on the deposited plan to any extent not exceeding the limits of deviation,
(b)
in respect of Works Nos. 2, 4 and 5, deviate vertically from the levels of the works to any extent not exceeding 3 metres upwards and to such extent downwards as may be necessary or convenient, and
(c)
in respect of Work No. 1, deviate vertically from the levels of the works to any extent not exceeding 3 metres downwards and to such extent upwards as may be necessary or convenient.