Introductory text
GAS
PIPE-LINES
Made 5th September 2023
Laid before Parliament 6th September 2023
Coming into force 27th September 2023
The Secretary of State has consulted the Oil and Gas Authority in accordance with section 25(1)(a) of the Petroleum Act 1998 and section 7(4) of the Energy Act 2008.
Annotations
Footnotes
- f1
-
1998 c. 17. Subsection (2A) was inserted into section 24 by paragraph 7(2) of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23).
- f2