# Pipelines Safety Regulations (Northern Ireland) 1997, Regulation 9: Construction and installation

Extent: N.I.
Status: prospective

The operator shall ensure that a fluid is not conveyed in a pipeline (save for the purpose of testing it) unless the pipeline has been so constructed and installed that, so far as is reasonably practicable, it is sound and fit for the purpose for which it has been designed.

---
Source: https://www.legislation.gov.uk/nisr/1997/193/regulation/9 (the official version)
Page: https://openlegislation.uk/pipelines-safety-regulations-northern-ireland-1997/regulation-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

