# Planning and Infrastructure Act 2025, Section 50: Accessibility of public charging or refuelling points

Extent: E+W
Status: prospective

In section 10 of the Automated and Electric Vehicles Act 2018 (public charging or refuelling points: access, standards and connection) at the end insert—
“(5) Regulations may impose requirements in connection with the accessibility of public charging or refuelling points in England, Wales and Scotland, such as requirements relating to—
(a) the design of the point,
(b) the location, placement or surroundings of the point, and
(c) the provision of assistance in using the point.
(6) Regulations under subsection (5) may prescribe requirements by reference to technical standards or specifications published by a person specified in the regulations (including standards or specifications as amended from time to time).
(7) Regulations under subsection (5) may impose requirements on any person, including—
(a) persons making, supplying, importing, operating or installing public charging or refuelling points;
(b) the owners or occupiers of land on which public charging or refuelling points are situated.
(8) Regulations under subsection (5) may not impose requirements on owners or occupiers of domestic premises.”

---
Source: https://www.legislation.gov.uk/ukpga/2025/34/section/50 (the official version)
Page: https://openlegislation.uk/planning-and-infrastructure-act-2025/section-50
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

