(a) Thermal power stations and other combustion installations with a heat output of 300 megawatts or more; and
(b) Nuclear power stations and other nuclear reactors (except research installations for the production and conversion of fissionable and fertile materials, whose maximum power does not exceed 1 kilowatt continuous thermal load).

---