# The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, Paragraph 4: Cost-benefit analysis


An operator of an installation, carrying out an activity with a total net thermal input exceeding 20 megawatts and generating electricity must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.

---