# The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, Paragraph 7: Cost-benefit analysis


An operator of an installation with a total net thermal input exceeding 20 megawatts, and generating waste heat at a useful temperature level must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.

---
Source: https://www.legislation.gov.uk/nisr/2013/160/schedule/13A/paragraph/7 (the official version)
Page: https://openlegislation.uk/pollution-prevention-and-control-industrial-emissions-regulations-northern-ireland-2013/schedule-13A/paragraph-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

