Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:
- Sch. 1 Pt. 1 Section 5.2 word inserted by Landfill 2003 reg. 8(1)(a)
- Sch. 1 Pt. 1 Section 5.2 words inserted by Landfill 2003 reg. 8(1)(b)
- Sch. 1 Pt. 1 section 6.8(iv) substituted by Animal By-Products 2003 Sch. 5 Pt. 2 para. 2(a)
- Sch. 1 Pt. 1 section 6.8(ix) substituted by Animal By-Products 2003 Sch. 5 Pt. 2 para. 2(b)
- Sch. 1 Pt. 1 section 5.1 substituted by Waste Incineration 2003 reg. 9
- Sch. 1 Pt. 1 section 6.8 words omitted by Waste Incineration 2003 reg. 10
- Sch. 1 Pt. 1 section 6.8 words inserted by Waste Incineration 2003 reg. 10
- Sch 1, Pt I, s 4.2, Pt A am by Pollution Prevention and Control 2004 reg 2(1), (2)(b)
- Sch 1, Pt I, s 6.8, Pt A am by Pollution Prevention and Control 2004 reg 2(1), (2)(c)(i)
- Sch 1, Pt I, s 6.8 defn(s) subst by Pollution Prevention and Control 2004 reg 2(1), (2)(c)(ii)
- Sch 1, Pt 2, para 10 am by Pollution Prevention and Control 2004 reg 2(1), (3)
- Sch. 1 Pt. 2 para. 2(2) substituted by Solvent Emissions 2004 reg. 18(b)(i)
- Sch. 1 Pt. 2 para. 3-7 words inserted by Solvent Emissions 2004 reg. 18(b)(ii)
- Sch. 1 Pt. 2 para. 7A inserted by Solvent Emissions 2004 reg. 18(b)(iii)
- Sch. 1 Pt. 2 para. 9(4) 10 words inserted by Solvent Emissions 2004 reg. 18(b)(iv)
- Sch. 1 Pt. 3 para. 18(d) words inserted by Solvent Emissions 2004 reg. 18(c)
- Sch. 1 Pt. 3 para. 18(e) and comma inserted by Solvent Emissions 2004 reg. 18(d)
- Sch 1, Pt 2, para 3 subst by Pollution Prevention and Control 2005 regs 2, 14(a)
- Sch 1, Pt 2, para 3A added by Pollution Prevention and Control 2005 regs 2, 14(b)
- Sch 1, Pt 2, para 9 am by Pollution Prevention and Control 2005 regs 2, 14(c), (d)
- Sch 1, Pt 2, para 14 am by Pollution Prevention and Control 2005 regs 2, 14(e)
- Sch. 1 Ch. 1 s. 5.4 substituted by Pollution Prevention and Control (Public Participation etc.) 2005 reg. 6(a)
- Sch. 1 Ch. 7 s. 7 words inserted by Pollution Prevention and Control (Public Participation etc.) 2005 reg. 6(b)
- Sch. 1 Pt. 1 Ch. 7 Pt. B para. 2 words substituted by Solvent Emissions 2010 reg. 2(3)(e)
- Sch. 1 Pt. 1 Section 1.1 words inserted by Waste 2011 Sch. para. 5
- Sch. 1 Pt. 1 words substituted by Waste 2011 Sch. para. 6
- Sch. 1 Pt. 1 Section 5.1 words substituted by Waste 2011 Sch. para. 7(a)
- Sch. 1 Pt. 1 Section 5.1 words substituted by Waste 2011 Sch. para. 7(b)
- Sch. 1 Pt. 1 Section 5.3 Pt. A(b) words inserted by Waste 2011 Sch. para. 8(a)
- Sch. 1 Pt. 1 Section 5.3 Pt. A(c)(i) words substituted by Waste 2011 Sch. para. 8(b)
- Sch. 1 Pt. 1 Section 5.3 Pt. A(c)(ii) words substituted by Waste 2011 Sch. para. 8(c)
- Sch. 1 Pt. 1 Section 5.3 Pt. A words substituted by Waste 2011 Sch. para. 8(d)
- Sch. 1 Pt. 1 Section 5.3 Pt. A words substituted by Waste 2011 Sch. para. 8(e)
- Sch. 1 Pt. 1 Section 5.4 Pt. A(c) words substituted by Waste 2011 Sch. para. 9(a)
- Sch. 1 Pt. 1 Section 5.4 Pt. A(c)(ii) words omitted by Waste 2011 Sch. para. 9(b)
- Sch. 1 Pt. 1 Section 5.4 Pt. A words substituted by Waste 2011 Sch. para. 9(c)
- Sch. 1 section 1.2 heading words inserted by Control of Volatile Organic Compounds (Petrol Vapour Recovery) 2011 reg. 4(3)(a)
- Sch. 1 Part B words inserted by Control of Volatile Organic Compounds (Petrol Vapour Recovery) 2011 reg. 4(3)(c)(i)(aa)
- Sch. 1 Part B words substituted by Control of Volatile Organic Compounds (Petrol Vapour Recovery) 2011 reg. 4(3)(c)(i)(bb)
- Sch. 1 Part B words inserted by Control of Volatile Organic Compounds (Petrol Vapour Recovery) 2011 reg. 4(3)(c)(i)(cc)
- Sch. 1 Part B words substituted by Control of Volatile Organic Compounds (Petrol Vapour Recovery) 2011 reg. 4(3)(c)(ii)
- Sch. 1 Pt. 1 Section 1.2 Pt. B words inserted by Pollution Prevention and Control 2008 reg. 2(3)(a)
- Sch. 1 Pt. 1 Section 1.2 Pt. B words inserted by Pollution Prevention and Control 2008 reg. 2(3)(b)
- Sch. 1 Pt. 1 Section 1.2 Pt. B words inserted by Pollution Prevention and Control 2008 reg. 2(3)(c)
Any activity not falling within Part A of this Section or within any other description in this Schedule involving–
(i)
heating, but not distilling, tar or bitumen in connection with any process of manufacture; or
(ii)
oxidising bitumen by blowing air through it, at installations where there are no other activities prescribed in this Schedule,
where the carrying on of the activities by the person concerned at the location in question is likely to involve the use in any 12 month period of 5 tonnes or more of tar or of bitumen or, in aggregate, of both.