# The Port of Tilbury Transfer Scheme 1991 Confirmation Order 1992, Part I: THE LICENSED WORKS


(1)
(2)
(3)
Brief Description
Period of Notice
Permitted Use
1
Passenger Landing Stage (London International Cruise Terminal) and Ro/Ro Berth
12 months
Embarkation and disembarkation of passengers, loading and discharging of goods and cargo, ship repairs, office and storage
Main Poontoon, Approach Brows, Booms (A, B, C), Travelling Gangways, safety Chains, Accommodation (Main Pontoon),
(i) Bailey Bridge
(ii) Breasting Dolphin
(iii) Mooring Dolphin
(iv) Pontoon
(v) Pontoon (First Floor)
(vi) Terminal Buildings
2
Tilbury Riverside Station forecourt and jetty supporting bailey bridge
12 months
Access to station and parking, access to eastern end of Tilbury Riverside Landing Stage and support for bailey bridge
Supports and raft Jetty
3
Tidal Basin Lead-in Jetty
3 months
Lead-in jetty for vessels using the Tidal Basin
4
Repair Jetty (Lower)
Main Jetty,
Approach Jetty,
Bailey Bridge,
Mooring Dolphin,
2 Cranes,
Building,
Pipelines.
6 months
Ship repair
5
Repair Jetty (Upper)
Main Jetty,
Approach Jetty,
Mooring Dolphins,
Crane.
6 months
Ship repair
6
Cargo Jetty
Main Jetty,
Approach,
Swingbridge,
Mooring Dolphin,
Crane,
Safety Chain/Rail,
Building,
Covered Warehouse Space
12 months
Covered storage, loading and unloading of cargoes
7
Entrance Lock-Lead-In Jetties
(i) Downstream Jetty
Walkway,
Linear Fendering,
Building,
Mooring Dolphin,
Ladder.
6 months
Berthing and unberthing of vessels using Tilbury Dock
(ii) Upstream Jetty
Main Jetty,
Walkway,
Fender Piles,
Ladders,
Safety Chain.
6 months
Berthing and unberthing of vessels using Tilbury Dock
8
Northfleet Hope Container Terminal
Main Jetty (False Quay),
Fender Piles 21,
Inspection Tunnel,
8" F.W. Pipe,
Walkway,
Building,
2 Cranes.
6 months
Import and export of cargoes
9
Grain Terminal
(i) Approach Jetty
Jetty area,
Overhead gantry,
support structures and conveyor belts,
2 × Site Offices,
6" F.W. Pipes, Dry Riser
6" F.W. Pipes, Wet Main
Fire Hydrants,
Galvanised Fence,
Safety Rail.
12 months
Import and export of grain, seed, animal foodstuffs and other similar products
(ii) Barge Mooring Station
Breasting Dolphins 8,
4 × Collar Barges,
Connecting Walkways, Ladders.
12 months
Lying-up berth for vessels at the Grain Terminal
(iii) Coaster Berth
Jetties,
Connecting walkways,
Connecting Pontoon,
Connecting Gangway,
Fender Piles 4,
2 × Pneumatic Boom Installation,
Fire Hydrants 2,
Overhead Gantry Installation.
12 months
Import and export of grain, seed, animal foodstuffs and other similar products
(iv) Main Jetty
Jetty Area,
Walway (Jetty),
Walkway (Overhead),
1 × Mooring Dolphin,
2 × Breasting Dolphins,
2 × Marine Leg Elevators,
6 × Barge Loading Spouts
Installations, Ladders,
Safety Chains,
Overhead Conveyor Installation,
Chain Conveyor,
Export Conveyor,
Sub-Station,
Junction Tower and Steps.
12 months
Import and export of grain, seed, animal foodstuffs and other similar products
(v) Ships Tier
Gravesend Mooring,
Tilbury Grain Terminal Mooring.
12 months
Moorings for vessels using the Grain Terminal
10
Impounding Station Intake Heads
4 × pumps.
3 months
Impounding of water into Tilbury Dock.

---
Source: https://www.legislation.gov.uk/uksi/1992/284/schedule/5/part/I (the official version)
Page: https://openlegislation.uk/port-of-tilbury-transfer-scheme-1991-confirmation-order-1992/schedule-5/part-I
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

