# The Portishead Branch Line (MetroWest Phase 1) (Correction) Order 2025, Article 2: Corrections to the Portishead Branch Line (MetroWest Phase 1) Order 2022


The Portishead Branch Line (MetroWest Phase 1) Order 2022 is corrected as set out in the table in the Schedule of this Order, where—
(a) column 1 sets out where the correction is to be made;
(b) column 2 sets out how the correction is to be made; and
(c) column 3 sets out the text to be substituted, inserted or omitted.

---
Source: https://www.legislation.gov.uk/uksi/2025/1097/article/2 (the official version)
Page: https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-correction-order-2025/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

