  "title": "The Portishead Branch Line (MetroWest Phase 1) Order 2022",
  "short_title": "Portishead Branch Line (MetroWest Phase 1) 2022",
  "long_title": "This Order authorises North Somerset District Council to construct a new railway on the formation of the disused Portishead Branch Line railway and to carry out works to upgrade the existing freight only Parson Street to Royal Portbury Dock railway to allow it to be used for passenger railway services.",
  "citation": "S.I. 2022/1194",
  "type": "uksi",
  "year": "2022",
  "number": "1194",
  "version": "current",
  "date": "2022-11-14",
  "revised": true,
  "valid_from": "2025-10-17",
  "extent": "E+W",
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/introduction",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "Preliminary",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/1",
      "kind": "article",
      "number": "1",
      "heading": "Citation and commencement",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-1",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/2",
      "kind": "article",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-2",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/3",
      "kind": "article",
      "number": "3",
      "heading": "Incorporation of the Railway Clauses Acts",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-3",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "Principal powers",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/4",
      "kind": "article",
      "number": "4",
      "heading": "Application and modification of legislation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-4",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/5",
      "kind": "article",
      "number": "5",
      "heading": "Development consent etc. granted by the Order",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-5",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/6",
      "kind": "article",
      "number": "6",
      "heading": "Planning permission",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-6",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/7",
      "kind": "article",
      "number": "7",
      "heading": "Limits of deviation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-7",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/8",
      "kind": "article",
      "number": "8",
      "heading": "Maintenance of authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-8",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/9",
      "kind": "article",
      "number": "9",
      "heading": "Benefit of Order",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-9",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/10",
      "kind": "article",
      "number": "10",
      "heading": "Consent to transfer benefit of Order",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-10",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/11",
      "kind": "article",
      "number": "11",
      "heading": "Agreements with Network Rail",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-11",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "Streets, Highways and Level Crossings",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/12",
      "kind": "article",
      "number": "12",
      "heading": "Application of the 1991 Act",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-12",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/13",
      "kind": "article",
      "number": "13",
      "heading": "Street works and power to alter the layout etc. of streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-13",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/14",
      "kind": "article",
      "number": "14",
      "heading": "Permanent stopping up of streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-14",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/15",
      "kind": "article",
      "number": "15",
      "heading": "Temporary stopping up of streets and public rights of way",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-15",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/16",
      "kind": "article",
      "number": "16",
      "heading": "Bridleways, cycle tracks and footpaths",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-16",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/17",
      "kind": "article",
      "number": "17",
      "heading": "Access to works",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-17",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/18",
      "kind": "article",
      "number": "18",
      "heading": "Agreements with street authorities",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-18",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/19",
      "kind": "article",
      "number": "19",
      "heading": "Construction and maintenance of new or altered streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-19",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/20",
      "kind": "article",
      "number": "20",
      "heading": "Closure of level crossings and crossings over disused railway",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-20",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/21",
      "kind": "article",
      "number": "21",
      "heading": "Accommodation and occupation crossings",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-21",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "Supplemental powers",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/22",
      "kind": "article",
      "number": "22",
      "heading": "Discharge of water",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-22",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/23",
      "kind": "article",
      "number": "23",
      "heading": "Authority to survey and investigate land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-23",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "Powers of acquisition",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/24",
      "kind": "article",
      "number": "24",
      "heading": "Compulsory acquisition of land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-24",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/25",
      "kind": "article",
      "number": "25",
      "heading": "Modification of Part 1 of the 1965 Act",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-25",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/26",
      "kind": "article",
      "number": "26",
      "heading": "Time limit for exercise of authority to acquire land compulsorily or take land temporarily",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-26",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/27",
      "kind": "article",
      "number": "27",
      "heading": "Compulsory acquisition of rights or imposition of covenants",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-27",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/28",
      "kind": "article",
      "number": "28",
      "heading": "Private rights over land subject to compulsory acquisition or temporary possession",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-28",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/29",
      "kind": "article",
      "number": "29",
      "heading": "Power to override easements and other rights",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-29",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/30",
      "kind": "article",
      "number": "30",
      "heading": "Application of the 1981 Act",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-30",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/31",
      "kind": "article",
      "number": "31",
      "heading": "Acquisition of subsoil or airspace only",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-31",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/32",
      "kind": "article",
      "number": "32",
      "heading": "Rights under or over streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-32",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/33",
      "kind": "article",
      "number": "33",
      "heading": "Temporary use of land for carrying out the authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-33",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/34",
      "kind": "article",
      "number": "34",
      "heading": "Temporary use of land for maintaining the authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-34",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/35",
      "kind": "article",
      "number": "35",
      "heading": "Disregard of certain interests and improvements",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-35",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/36",
      "kind": "article",
      "number": "36",
      "heading": "Set-off for enhancement in value of retained land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-36",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/37",
      "kind": "article",
      "number": "37",
      "heading": "Statutory undertakers and electronic communications code network operators",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-37",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/38",
      "kind": "article",
      "number": "38",
      "heading": "Recovery of costs of new connections",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-38",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": "Operations",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/39",
      "kind": "article",
      "number": "39",
      "heading": "Operation and use of railways",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-39",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/40",
      "kind": "article",
      "number": "40",
      "heading": "Operational land for purposes of the 1990 Act",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-40",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "part/7",
      "kind": "part",
      "number": "7",
      "heading": "Miscellaneous and general",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/41",
      "kind": "article",
      "number": "41",
      "heading": "No double recovery",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-41",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/42",
      "kind": "article",
      "number": "42",
      "heading": "Apparatus and rights of statutory undertakers in stopped up streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-42",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/43",
      "kind": "article",
      "number": "43",
      "heading": "Felling or lopping of trees",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-43",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/44",
      "kind": "article",
      "number": "44",
      "heading": "Hedgerows",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-44",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/45",
      "kind": "article",
      "number": "45",
      "heading": "Defence to proceedings in respect of statutory nuisance",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-45",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/46",
      "kind": "article",
      "number": "46",
      "heading": "Traffic regulation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-46",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/47",
      "kind": "article",
      "number": "47",
      "heading": "Application of the Land Compensation Act 1973",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-47",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/48",
      "kind": "article",
      "number": "48",
      "heading": "Application of landlord and tenant law",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-48",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/49",
      "kind": "article",
      "number": "49",
      "heading": "Procedure in relation to further approvals, etc.",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-49",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/50",
      "kind": "article",
      "number": "50",
      "heading": "Service of notices",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-50",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/51",
      "kind": "article",
      "number": "51",
      "heading": "Crown rights",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-51",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/52",
      "kind": "article",
      "number": "52",
      "heading": "Amendment of local byelaws",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-52",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/53",
      "kind": "article",
      "number": "53",
      "heading": "Protective provisions",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-53",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/54",
      "kind": "article",
      "number": "54",
      "heading": "Special category land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-54",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/55",
      "kind": "article",
      "number": "55",
      "heading": "Documents to be certified",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-55",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/56",
      "kind": "article",
      "number": "56",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/article-56",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/signature",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "Authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-1",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "Requirements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Requirements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Time limits",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Stages of authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Submission and approval of detail design",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Construction Environmental Management Plan etc.",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Landscaping scheme – disused railway",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": "Landscaping – other works",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": "Temporary fencing",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": "Highway accesses",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": "Archaeology",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": "Surface and foul water drainage",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": "Trees",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": "Control of invasive plants outside of Avon Gorge Woodlands SAC",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": "Avon Gorge Woodlands SAC",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": "External lighting and control of artificial light emissions during construction",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": "Construction hours",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": "Contaminated land and groundwater",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": "Works to Winterstoke Road, Bristol",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": "Path at Marsh Lane, Easton in Gordano",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": "Temporary path at Avon Road, Pill",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": "Restoration of land used temporarily for construction",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": "Watercourses",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": "For the protection of bats",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": "Permanent fencing outside of Avon Gorge Woodlands SAC",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": "Permanent acoustic fencing",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": "Portishead Station and Portbury Ditch",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": "Pill Station",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": "Operational lighting – highways, bridges, paths and car parks",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/29",
      "kind": "paragraph",
      "number": "29",
      "heading": "Works affecting M5 Junction 19",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-29",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/30",
      "kind": "paragraph",
      "number": "30",
      "heading": "Clanage Road, Bristol",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-30",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/31",
      "kind": "paragraph",
      "number": "31",
      "heading": "New bridleway east of M5 Avonmouth Bridge",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-31",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/32",
      "kind": "paragraph",
      "number": "32",
      "heading": "Cattle Creep Bridge, Easton in Gordano",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-32",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/33",
      "kind": "paragraph",
      "number": "33",
      "heading": "Perimeter Track between Marsh Lane and the compounds under the M5 Avonmouth Bridge and on Lodway Farm",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-33",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/34",
      "kind": "paragraph",
      "number": "34",
      "heading": "Pill Tunnel Eastern Portal Compound Access, Ham Green",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-34",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/35",
      "kind": "paragraph",
      "number": "35",
      "heading": "Requirement for written approval",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-35",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/36",
      "kind": "paragraph",
      "number": "36",
      "heading": "Amendments to approved details",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-36",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/37",
      "kind": "paragraph",
      "number": "37",
      "heading": "Anticipatory steps towards compliance with any requirement",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-37",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Procedure for discharge of requirements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/38",
      "kind": "paragraph",
      "number": "38",
      "heading": "Applications made under requirements",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-38",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/2/paragraph/39",
      "kind": "paragraph",
      "number": "39",
      "heading": "Further information",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-39",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/2/paragraph/40",
      "kind": "paragraph",
      "number": "40",
      "heading": "Appeals",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-40",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/2/paragraph/41",
      "kind": "paragraph",
      "number": "41",
      "heading": "Interpretation of Part 2 of Schedule 2",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-2/paragraph-41",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "Streets subject to street works",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-3",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4",
      "kind": "schedule",
      "number": "4",
      "heading": "Streets to be stopped up",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Street for which a substitute is to be provided",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-4/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Streets for which no substitute is to be provided",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-4/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/5",
      "kind": "schedule",
      "number": "5",
      "heading": "Streets to be stopped up temporarily",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/5/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Street to be stopped up temporarily for which a substitute is to be provided",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-5/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Bridleways and footpaths to be temporarily suspended for which no substitute is to be provided during suspension",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-5/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/6",
      "kind": "schedule",
      "number": "6",
      "heading": "Bridleways, cycle tracks and footpaths",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/6/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Footpath to be diverted",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-6/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/part/2",
      "kind": "part",
      "number": "2",
      "heading": "New public rights of way to be created",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-6/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/7",
      "kind": "schedule",
      "number": "7",
      "heading": "Access to works",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-7",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8",
      "kind": "schedule",
      "number": "8",
      "heading": "Closure of crossings",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Crossings: works required",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-8/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Crossings: No works required",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-8/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/9",
      "kind": "schedule",
      "number": "9",
      "heading": "Accommodation and occupation crossings",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/9/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Crossings extinguished: works required",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-9/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Crossings for which no substitute is to be provided",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-9/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/10",
      "kind": "schedule",
      "number": "10",
      "heading": "Land in which only new rights, etc., may be acquired",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-10",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/11",
      "kind": "schedule",
      "number": "11",
      "heading": "Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/11/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Compensation enactments",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-11/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-11/paragraph-2",
      "extent": null,
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-11/paragraph-3",
      "extent": null,
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Application of Part 1 of the 1965 Act",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-11/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-11/paragraph-5",
      "extent": null,
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/12",
      "kind": "schedule",
      "number": "12",
      "heading": "Land of which temporary possession may be taken",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-12",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/13",
      "kind": "schedule",
      "number": "13",
      "heading": "Hedgerows",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/13/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Hedgerows to be removed",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-13/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/13/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Important Hedgerow",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-13/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/14",
      "kind": "schedule",
      "number": "14",
      "heading": "Traffic Regulation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-14",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/15",
      "kind": "schedule",
      "number": "15",
      "heading": "Amendment of Local Legislation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-15",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/16",
      "kind": "schedule",
      "number": "16",
      "heading": "Protective Provisions",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/16/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Protection for Network Rail Infrastructure Limited",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/1"
    },
    {
      "path": "schedule/16/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Protection for Electricity, Gas, Water, Petroleum and Sewerage Undertakers.",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": "On street apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": "Retained apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/29",
      "kind": "paragraph",
      "number": "29",
      "heading": "Expenses and costs",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-29",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/30",
      "kind": "paragraph",
      "number": "30",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-30",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/paragraph/31",
      "kind": "paragraph",
      "number": "31",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-31",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/2"
    },
    {
      "path": "schedule/16/part/3",
      "kind": "part",
      "number": "3",
      "heading": "Protection for Operators of Electronic Communications Code Networks",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/32",
      "kind": "paragraph",
      "number": "32",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-32",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/3"
    },
    {
      "path": "schedule/16/paragraph/33",
      "kind": "paragraph",
      "number": "33",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-33",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/3"
    },
    {
      "path": "schedule/16/paragraph/34",
      "kind": "paragraph",
      "number": "34",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-34",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/3"
    },
    {
      "path": "schedule/16/paragraph/35",
      "kind": "paragraph",
      "number": "35",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-35",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/3"
    },
    {
      "path": "schedule/16/paragraph/36",
      "kind": "paragraph",
      "number": "36",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-36",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/3"
    },
    {
      "path": "schedule/16/part/4",
      "kind": "part",
      "number": "4",
      "heading": "Protection for the Environment Agency",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/37",
      "kind": "paragraph",
      "number": "37",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-37",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/4"
    },
    {
      "path": "schedule/16/paragraph/38",
      "kind": "paragraph",
      "number": "38",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-38",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/4"
    },
    {
      "path": "schedule/16/paragraph/39",
      "kind": "paragraph",
      "number": "39",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-39",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/4"
    },
    {
      "path": "schedule/16/paragraph/40",
      "kind": "paragraph",
      "number": "40",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-40",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/4"
    },
    {
      "path": "schedule/16/paragraph/41",
      "kind": "paragraph",
      "number": "41",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-41",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/4"
    },
    {
      "path": "schedule/16/part/5",
      "kind": "part",
      "number": "5",
      "heading": "Protection for First Corporate Shipping Limited",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/42",
      "kind": "paragraph",
      "number": "42",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-42",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/43",
      "kind": "paragraph",
      "number": "43",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-43",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/44",
      "kind": "paragraph",
      "number": "44",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-44",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/45",
      "kind": "paragraph",
      "number": "45",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-45",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/46",
      "kind": "paragraph",
      "number": "46",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-46",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/47",
      "kind": "paragraph",
      "number": "47",
      "heading": "Watercourses and drainage",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-47",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/48",
      "kind": "paragraph",
      "number": "48",
      "heading": "Surveys",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-48",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/49",
      "kind": "paragraph",
      "number": "49",
      "heading": "Streets, access and public rights of way",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-49",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/50",
      "kind": "paragraph",
      "number": "50",
      "heading": "Acquisition and use of land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-50",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/51",
      "kind": "paragraph",
      "number": "51",
      "heading": "Use of land and execution, maintenance and use of the authorised development",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-51",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/52",
      "kind": "paragraph",
      "number": "52",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-52",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/53",
      "kind": "paragraph",
      "number": "53",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-53",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/54",
      "kind": "paragraph",
      "number": "54",
      "heading": "Works",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-54",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/55",
      "kind": "paragraph",
      "number": "55",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-55",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/56",
      "kind": "paragraph",
      "number": "56",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-56",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/57",
      "kind": "paragraph",
      "number": "57",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-57",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/58",
      "kind": "paragraph",
      "number": "58",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-58",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/59",
      "kind": "paragraph",
      "number": "59",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-59",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/60",
      "kind": "paragraph",
      "number": "60",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-60",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/61",
      "kind": "paragraph",
      "number": "61",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-61",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/62",
      "kind": "paragraph",
      "number": "62",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-62",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/63",
      "kind": "paragraph",
      "number": "63",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-63",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/64",
      "kind": "paragraph",
      "number": "64",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-64",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/65",
      "kind": "paragraph",
      "number": "65",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-65",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/66",
      "kind": "paragraph",
      "number": "66",
      "heading": "BPC’s apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-66",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/67",
      "kind": "paragraph",
      "number": "67",
      "heading": "The Port’s railway",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-67",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/68",
      "kind": "paragraph",
      "number": "68",
      "heading": "Trees and other vegetation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-68",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/69",
      "kind": "paragraph",
      "number": "69",
      "heading": "General",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-69",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/paragraph/70",
      "kind": "paragraph",
      "number": "70",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-70",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/5"
    },
    {
      "path": "schedule/16/part/6",
      "kind": "part",
      "number": "6",
      "heading": "Protection for Exolum Pipeline System Ltd",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/71",
      "kind": "paragraph",
      "number": "71",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-71",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/72",
      "kind": "paragraph",
      "number": "72",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-72",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/73",
      "kind": "paragraph",
      "number": "73",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-73",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/74",
      "kind": "paragraph",
      "number": "74",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-74",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/75",
      "kind": "paragraph",
      "number": "75",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-75",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/76",
      "kind": "paragraph",
      "number": "76",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-76",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/77",
      "kind": "paragraph",
      "number": "77",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-77",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/paragraph/78",
      "kind": "paragraph",
      "number": "78",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-78",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/6"
    },
    {
      "path": "schedule/16/part/7",
      "kind": "part",
      "number": "7",
      "heading": "For the protection of Western Power Distribution Limited (South West) Plc",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/79",
      "kind": "paragraph",
      "number": "79",
      "heading": "Application",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-79",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/80",
      "kind": "paragraph",
      "number": "80",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-80",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/81",
      "kind": "paragraph",
      "number": "81",
      "heading": "Precedence of 1991 Act in respect of apparatus in streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-81",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/82",
      "kind": "paragraph",
      "number": "82",
      "heading": "No acquisition or extinguishment except by agreement",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-82",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/83",
      "kind": "paragraph",
      "number": "83",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-83",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/84",
      "kind": "paragraph",
      "number": "84",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-84",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/85",
      "kind": "paragraph",
      "number": "85",
      "heading": "Expenses and costs",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-85",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/86",
      "kind": "paragraph",
      "number": "86",
      "heading": "Expert determination",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-86",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/87",
      "kind": "paragraph",
      "number": "87",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-87",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/paragraph/88",
      "kind": "paragraph",
      "number": "88",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-88",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/7"
    },
    {
      "path": "schedule/16/part/8",
      "kind": "part",
      "number": "8",
      "heading": "For the protection of National Grid as electricity undertaker",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/89",
      "kind": "paragraph",
      "number": "89",
      "heading": "Application",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-89",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/90",
      "kind": "paragraph",
      "number": "90",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-90",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/91",
      "kind": "paragraph",
      "number": "91",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-91",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/92",
      "kind": "paragraph",
      "number": "92",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-92",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/93",
      "kind": "paragraph",
      "number": "93",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-93",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/94",
      "kind": "paragraph",
      "number": "94",
      "heading": "Apparatus of National Grid in stopped up streets",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-94",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/95",
      "kind": "paragraph",
      "number": "95",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-95",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/96",
      "kind": "paragraph",
      "number": "96",
      "heading": "Removal of existing apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-96",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/97",
      "kind": "paragraph",
      "number": "97",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-97",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/98",
      "kind": "paragraph",
      "number": "98",
      "heading": "Retained apparatus",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-98",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/99",
      "kind": "paragraph",
      "number": "99",
      "heading": "Expenses",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-99",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/100",
      "kind": "paragraph",
      "number": "100",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-100",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/101",
      "kind": "paragraph",
      "number": "101",
      "heading": "Enactments and agreements",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-101",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/102",
      "kind": "paragraph",
      "number": "102",
      "heading": "Co-operation",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-102",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/103",
      "kind": "paragraph",
      "number": "103",
      "heading": "Access",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-103",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/104",
      "kind": "paragraph",
      "number": "104",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-104",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/paragraph/105",
      "kind": "paragraph",
      "number": "105",
      "heading": "Notices",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-105",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/8"
    },
    {
      "path": "schedule/16/part/9",
      "kind": "part",
      "number": "9",
      "heading": "For the protection of Wales and West Utilities (“WWU”)",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/106",
      "kind": "paragraph",
      "number": "106",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-106",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/107",
      "kind": "paragraph",
      "number": "107",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-107",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/108",
      "kind": "paragraph",
      "number": "108",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-108",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/109",
      "kind": "paragraph",
      "number": "109",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-109",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/110",
      "kind": "paragraph",
      "number": "110",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-110",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/111",
      "kind": "paragraph",
      "number": "111",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-111",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/112",
      "kind": "paragraph",
      "number": "112",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-112",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/113",
      "kind": "paragraph",
      "number": "113",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-113",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/114",
      "kind": "paragraph",
      "number": "114",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-114",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/115",
      "kind": "paragraph",
      "number": "115",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-115",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/paragraph/116",
      "kind": "paragraph",
      "number": "116",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-116",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/9"
    },
    {
      "path": "schedule/16/part/10",
      "kind": "part",
      "number": "10",
      "heading": "For the protection of the National Trust",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16"
    },
    {
      "path": "schedule/16/paragraph/117",
      "kind": "paragraph",
      "number": "117",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-117",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/118",
      "kind": "paragraph",
      "number": "118",
      "heading": "Powers of compulsory acquisition",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-118",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/119",
      "kind": "paragraph",
      "number": "119",
      "heading": "Works provisions",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-119",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/120",
      "kind": "paragraph",
      "number": "120",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-120",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/121",
      "kind": "paragraph",
      "number": "121",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-121",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/122",
      "kind": "paragraph",
      "number": "122",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-122",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/123",
      "kind": "paragraph",
      "number": "123",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-123",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/124",
      "kind": "paragraph",
      "number": "124",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-124",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/125",
      "kind": "paragraph",
      "number": "125",
      "heading": null,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-125",
      "extent": null,
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/16/paragraph/126",
      "kind": "paragraph",
      "number": "126",
      "heading": "Expert determination",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-16/paragraph-126",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/16/part/10"
    },
    {
      "path": "schedule/17",
      "kind": "schedule",
      "number": "17",
      "heading": "Documents to be Certified",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/schedule-17",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/note",
      "extent": "E+W",
      "status": null,
      "parent": null
    }
  ],
  "has_text": true,
  "pdfs": [
    {
      "title": "Printed copy",
      "main": true,
      "language": null,
      "date": "2022-11-18",
      "size": 799825,
      "url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/pdf/uksi_20221194_en.pdf",
      "source_url": "https://www.legislation.gov.uk/uksi/2022/1194/pdfs/uksi_20221194_en.pdf"
    }
  ],
  "outstanding_effects": [],
  "made_under": [
    {
      "id": "ukpga/2008/29",
      "title": "Planning Act 2008",
      "url": "https://openlegislation.uk/planning-act-2008",
      "provisions": [
        "section/114",
        "section/115",
        "section/117",
        "section/120",
        "section/122",
        "schedule/5/paragraph/1",
        "schedule/5/paragraph/2",
        "schedule/5/paragraph/3",
        "schedule/5/paragraph/10",
        "schedule/5/paragraph/11",
        "schedule/5/paragraph/12",
        "schedule/5/paragraph/13",
        "schedule/5/paragraph/14",
        "schedule/5/paragraph/15",
        "schedule/5/paragraph/16",
        "schedule/5/paragraph/17",
        "schedule/5/paragraph/20",
        "schedule/5/paragraph/23",
        "schedule/5/paragraph/24",
        "schedule/5/paragraph/26",
        "schedule/5/paragraph/33",
        "schedule/5/paragraph/34",
        "schedule/5/paragraph/36",
        "schedule/5/paragraph/37"
      ]
    }
  ],
  "changes_made_to": 261,
  "changes_made_to_url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/changes.json",
  "changes_made_by": 300,
  "changes_made_by_url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/portishead-branch-line-metrowest-phase-1-order-2022/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/1194",
    "retrieved_at": "2026-10-28T21:53:31.025268+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}