  "url": "https://openlegislation.uk/portland-harbour-revision-order-2010/article-5",
  "json_url": "https://openlegislation.uk/portland-harbour-revision-order-2010/article-5.json",
  "legislation": "uksi/2010/703",
  "legislation_title": "The Portland Harbour Revision Order 2010",
  "legislation_url": "https://openlegislation.uk/portland-harbour-revision-order-2010",
  "path": "article/5",
  "kind": "article",
  "number": "5",
  "heading": "Subsidiary works",
  "text": "(1) Subject to the provisions of this Order, the Company may from time to time, within the limits of deviation, erect, construct, lay down, place, remove, replace, work or use and maintain whether temporarily or permanently all such works, conveniences, appliances and apparatus and take such measures as it from time to time considers fit for the purposes of, or in connection with, or incidental to the construction, maintenance and use of the authorised works, including but not limited to, trial boreholes, abutments, booms, pontoons, fenders, ladders, tanks, pumps, conduits, pipes, pipelines, wires, mains, cables, rails, signals, conveyors, cranes, lifts, drops, loading racks, chiksan arms and other cargo handling equipment for solid, liquid or gas cargoes, lifting equipment, weighbridges, stairs, stagings, quays, jetties, piers, waterways, bridges, approaches, slipways, catwalks, landing places, berthing heads, dolphins, mooring posts, buoys, bollards, buildings, sheds, silos, tanks and storage tanks, repair and machine shops, offices, depots, car parks (including multi-storey), roads, walls, bunds, fences, gates, equipment, machinery, appliances, navigation marks and lights and including in particular—\n(a) construction of general and temperature controlled cargo transit sheds within the areas noted on the deposited plans as sheds or general cargo transit sheds;\n(b) construction of new or extended passenger and cruise terminals within the areas so described on the deposited plans, together with ancillary facilities including stores for baggage and general cargo;\n(c) construction of administration offices and workshops within the area described on the deposited plans as administration and workshops;\n(d) construction of marshalling yards, public moorings and public car parking within the areas so described on the deposited plans;\n(e) construction of ship repair, maintenance and rebuild facilities for all vessels in the harbour within the area so described on the deposited plans,\ntogether with ancillary accesses, lighting, services and other facilities.\n(2) In the course of erecting, constructing, laying down, placing, removing and replacing the authorised works the Company may carry out construction activity, including the temporary placing of plant and equipment, within the water adjoining the limits of deviation.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2010/703/article/5",
    "retrieved_at": "2026-10-29T02:48:40.578288+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}