# The Portsmouth Flathouse Quay Harbour Revision Order 1990, Article 4: Power to Construct etc Works


(1) Subject to the provisions of this Order, the Council may, when they have acquired the necessary lands or obtained sufficient interests therein, make and maintain within the limits of deviation the following works in the City of Portsmouth: A quay wall on the seaward side of the existing Flathouse Quay commencing by a junction with Berth 2 at its north-western end, passing in a north-westerly direction for a distance of 14 metres on a seaward projection of the line of the seaward face of Berth 2, then turning south-westwards to a line parallel to the existing face of Berth 1 at a distance of 10 metres from that face and passing on that line for a distance of 188 metres, then turning south-south-eastwards and terminating by a junction with the existing face of Berth 1 at the boundary of Flathouse Quay with HM Naval Base, Portsmouth.
(2) The Council may demolish and remove the disused triangular dolphin situated 90 metres seaward of Flathouse Quay Berth One at Latitude 1° 05' 29"W Longitude 50° 48' 32"N.
(3) The Council may within the limits of deviation extend, enlarge, alter, replace or relay the authorised works.
(4) For the purposes of this Article and Articles 5, 6 and 7, the Council may authorise any person, company or undertaking to carry out the authorised works, as agent of the Council or otherwise.

---
Source: https://www.legislation.gov.uk/uksi/1990/1659/article/4 (the official version)
Page: https://openlegislation.uk/portsmouth-flathouse-quay-harbour-revision-order-1990/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.