# The Portsmouth Harbour (Gunwharf Quays) (Millennium Tower) Order 2001, Article 4: Power to deviate


In constructing or maintaining the scheduled works, the undertaker may—
(a) deviate laterally from the situations shown on the deposited plans for a distance not exceeding 5 metres within the limits of deviation for construction purposes;
(b) deviate vertically from the levels shown for that work on the deposited section—
(i) to any extent not exceeding 5 metres upwards, or
(ii) to any extent downwards as may be necessary or convenient.

---