# The Portsmouth Harbour (Gunwharf Quays) Order 1999, Article 4: Power to deviate


In constructing or maintaining the scheduled works, the undertaker may–
(a) deviate laterally from the situations shown on the deposited plans within the limits of deviation,
(b) deviate vertically from the levels shown for those works on the deposited sections–
(i) to any extent not exceeding 5 metres upwards, or
(ii) to any extent downwards as may be necessary or convenient, and
(c) deviate vertically from the levels shown on the deposited sections for the buildings and other structures for commercial and leisure purposes comprised in Work No. 1 to any extent upwards as may be necessary or convenient.

---
Source: https://www.legislation.gov.uk/uksi/1999/50/article/4 (the official version)
Page: https://openlegislation.uk/portsmouth-harbour-gunwharf-quays-order-1999/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

