# The Portsmouth Harbour (Gunwharf Quays) Order 1999, Schedule 1: SCHEDULED WORKS


In the City of Portsmouth–
Work No 1. Piled suspended deck over area shown shaded on drawing 97.100.024 C (sheet 2 of 2) together with a link connecting the suspended decking to the Wightlink Pedestrian Jetty together with buildings and other structures for commercial and leisure purposes situated upon the said piled deck.
Work No 2. Replacement quay walls between chainage 221 metres and chainage 320 metres.
Work No 3. Replacement quay walls between chainage 199 metres and chainage 70 metres together with demolition of the Marlborough Pier.
Work No 4. Cofferdam wall across Vernon Creek between chainage 199 metres and 221 metres.
Work No 5. Cantilevered belvedere and replacement quays between chainage 70 metres and 10 metres—existing sea wall to remain exposed over this length.
Work No 6. Replacement quay walls between chainage 10 metres and chainage—30 metres.

---
Source: https://www.legislation.gov.uk/uksi/1999/50/schedule/1 (the official version)