Article 4 Power to construct works

Original text. Later amendments are not shown.

(1)

Subject to the provisions of this Order, the Council may, when they have acquired the necessary lands or obtained sufficient interests therein, make and maintain, within the limits of deviation, the following works in the City of Portsmouth: a quay and reclamation south and west of the existing Portsmouth Continental Ferry Port Berth Number 2 within an imaginary line commencing at the north west corner of the existing Berth Number 2 structure at point 463877 101682, passing in a west south-westerly direction for a distance of 75 metres to point 463806 101652, thence in a south south-easterly direction for a distance of 38 metres to point 463820 101620, thence in an east north-easterly direction for a distance of 95 meres to point 463908 101654, thence continuing generally in the same direction for a distance of 116 metres to the northern face of the round dolphin situated at point 464021 101677, thence passing in a north-easterly direction for a distance of 13 metres to the south-west corner of the existing Berth Number 2 bank seat at point 464029 101687 and thence generally following along the line of the existing quay to return to the point of commencement.The points specified in this paragraph are Ordnance Survey National Grid reference points.

(2)

The council may within the limits of deviation extend, enlarge, alter, replace or relay the authorised works.

(3)

The Council may authorise any person to carry out the authorised works.