# The Progress Power (Gas Fired Power Station) (Amendment) Order 2016, Schedule


Table 2
Building or structure
Maximum height (metres above existing site level of approx-imately 48.5 metres AOD)
Minimum height (metres above existing site level of approx-imately 48.5 metres AOD)
Maximum length (metres)
Minimum length (metres)
Maximum width (metres)
Minimum width (metres)
Each gas turbine generator (where one gas turbine generator is constructed) (part of numbered work 1A)
19.0
–
50.0
–
40.0
–
Each gas turbine generator (where two gas turbine generators are constructed) (part of numbered work 1A)
19.0
–
30.0
–
30.0
–
Each gas turbine generator (where three, four or five gas turbine generators are constructed) (part of numbered work 1A)
10.0
–
36.0
–
23.0
–
Each exhaust gas emission flue stack (where one gas turbine generator is constructed) (part of numbered work 1A)
30.0
25.0
–
–
11.0 (up to and including a height of 16.5 metres above 48.5 metres AOD) and 10.0 (from a height exceeding 16.5 metres above 48.5 metres AOD to a height of 30.0 metres above 48.5 metres AOD)
–
Each exhaust gas emission flue stack (where two gas turbine generators are constructed) (part of numbered work 1A)
30.0
25.0
–
–
8.4
–
Each exhaust gas emission flue stack (where three, four or five gas turbine generators are constructed) (part of numbered work 1A)
30.0
25.0
–
–
6.0
–
Control room/office/ workshop (part of numbered work 1B)
6.0
–
29.0
–
23.0
–
Each black start diesel generator (part of numbered work 1B)
5.0
–
17.0
–
5.0
–
Raw/fire water tank (part of numbered work 1B)
11.0
–
11.0
–
11.0
–
Demineralised water tank (part of numbered work 1B)
2.0
–
2.0
–
2.0
–
Natural gas receiving station (part of numbered work 1B)
5.0
–
50.0
–
36.0
–
Gas treatment compound (part of numbered work 1B)
5.0
–
29.0
–
16.0
–
External fin fan cooler (where only one gas turbine generator is constructed) (part of numbered work 1B)
6.0
-
13.0
-
10.0
-
Switchyard /banking compound (part of numbered work 1C)
11.3
–
60.0
–
60.0
–
Switchgear building (part of numbered work 1C)
11.3
–
21.0
–
15.0
–
Gatehouse (part of numbered work 1D)
4.5
–
9.0
–
8.0
–
Above ground installation (part of numbered work 3A)
3.0
–
72.0
–
52.0
–
Pipeline inspection gauge facility (part of numbered work 3A)
2.0
–
36.0
–
27.0
–
Minimum offtake connection (part of numbered work 3A)
2.0
–
36.0
–
25.0
–
Sealing end compound (part of numbered work 5)
12.5
–
22.0
–
45.0
–
Substation:
(gas insulated substation) – (maximum compound size) (part of numbered work 5)
12.5
–
80.0
–
100.0
–
(gas insulated substation) –
(indoor switchgear hall) (part of numbered work 5)
12.5
–
21.0
–
62.0
–

---
Source: https://www.legislation.gov.uk/uksi/2016/1086/schedule (the official version)
Page: https://openlegislation.uk/progress-power-gas-fired-power-station-amendment-order-2016/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

