{
  "url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015/article-13",
  "json_url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015/article-13.json",
  "legislation": "uksi/2015/1570",
  "legislation_title": "The Progress Power (Gas Fired Power Station) Order 2015",
  "legislation_url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015",
  "path": "article/13",
  "kind": "article",
  "number": "13",
  "heading": "Access to works",
  "text": "The undertaker may, for the purposes of the authorised development—\n(a) form and layout the permanent means of access, or improve existing means of access, in the location specified in Part 1 of Schedule 3 (streets subject to permanent and temporary alteration of layout);\n(b) form and layout the temporary means of access in the location specified in Part 2 of Schedule 3 (streets subject to permanent and temporary alteration of layout); and\n(c) with the approval of the relevant planning authority after consultation with the highway authority, form and lay out such other means of access or improve the existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 13 in force at 14.8.2015, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1570/article/13",
    "retrieved_at": "2026-10-28T23:33:20.397524+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}