{
  "url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015/schedule-2/paragraph-3",
  "json_url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015/schedule-2/paragraph-3.json",
  "legislation": "uksi/2015/1570",
  "legislation_title": "The Progress Power (Gas Fired Power Station) Order 2015",
  "legislation_url": "https://openlegislation.uk/progress-power-gas-fired-power-station-order-2015",
  "path": "schedule/2/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Detailed Design",
  "text": "(1) The authorised development must be carried out in accordance with the approved plans in Table 1, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any Requirement (as the same may be amended by approval of the relevant planning authority pursuant to Requirement 22(1)).\n(2) In this paragraph “AOD” means above ordnance datum;\nTable 1\nWorks Plans\nRights of Way, Streets and Access Plan\n(3) The authorised development must be carried out in accordance with the parameters specified in Table 2 below (as the same may be amended by approval of the relevant planning authority pursuant to Requirement 22(1)).\nTable 2\nBuilding or structure\nMaximum height (metres above existing site level of approx-imately 48.5 metres AOD)\nMinimum height (metres above existing site level of approx-imately 48.5 metres AOD)\nMaximum length (metres)\nMinimum length (metres)\nMaximum width (metres)\nMinimum width (metres)\nEach gas turbine generator (where one gas turbine generator is constructed) (part of numbered work 1A)\n19.0\n–\n50.0\n–\n40.0\n–\nEach gas turbine generator (where two gas turbine generators are constructed) (part of numbered work 1A)\n19.0\n–\n30.0\n–\n30.0\n–\nEach gas turbine generator (where three, four or five gas turbine generators are constructed) (part of numbered work 1A)\n10.0\n–\n36.0\n–\n23.0\n–\nEach exhaust gas emission flue stack (where one gas turbine generator is constructed) (part of numbered work 1A)\n30.0\n25.0\n–\n–\n11.0 (up to and including a height of 16.5 metres above 48.5 metres AOD) and 10.0 (from a height exceeding 16.5 metres above 48.5 metres AOD to a height of 30.0 metres above 48.5 metres AOD)\n–\nEach exhaust gas emission flue stack (where two gas turbine generators are constructed) (part of numbered work 1A)\n30.0\n25.0\n–\n–\n8.4\n–\nEach exhaust gas emission flue stack (where three, four or five gas turbine generators are constructed) (part of numbered work 1A)\n30.0\n25.0\n–\n–\n6.0\n–\nControl room/office/ workshop (part of numbered work 1B)\n6.0\n–\n29.0\n–\n23.0\n–\nEach black start diesel generator (part of numbered work 1B)\n5.0\n–\n17.0\n–\n5.0\n–\nRaw/fire water tank (part of numbered work 1B)\n11.0\n–\n11.0\n–\n11.0\n–\nDemineralised water tank (part of numbered work 1B)\n2.0\n–\n2.0\n–\n2.0\n–\nNatural gas receiving station (part of numbered work 1B)\n5.0\n–\n50.0\n–\n36.0\n–\nGas treatment compound (part of numbered work 1B)\n5.0\n–\n29.0\n–\n16.0\n–\nExternal fin fan cooler (where only one gas turbine generator is constructed) (part of numbered work 1B)\n6.0\n-\n13.0\n-\n10.0\n-\nSwitchyard /banking compound (part of numbered work 1C)\n11.3\n–\n60.0\n–\n60.0\n–\nSwitchgear building (part of numbered work 1C)\n11.3\n–\n21.0\n–\n15.0\n–\nGatehouse (part of numbered work 1D)\n4.5\n–\n9.0\n–\n8.0\n–\nAbove ground installation (part of numbered work 3A)\n3.0\n–\n72.0\n–\n52.0\n–\nPipeline inspection gauge facility (part of numbered work 3A)\n2.0\n–\n36.0\n–\n27.0\n–\nMinimum offtake connection (part of numbered work 3A)\n2.0\n–\n36.0\n–\n25.0\n–\nSealing end compound (part of numbered work 5)\n12.5\n–\n22.0\n–\n45.0\n–\nSubstation:\n(gas insulated substation) – (maximum compound size) (part of numbered work 5)\n12.5\n–\n80.0\n–\n100.0\n–\n(gas insulated substation) –\n(indoor switchgear hall) (part of numbered work 5)\n12.5\n–\n21.0\n–\n62.0\n–\n(4) To the extent that design principles for any numbered work are set out in the design principles statement, that numbered work must be designed in accordance with the relevant design principle set out therein.\n(5) Except to the extent approved pursuant to Requirement 6, numbered works 1, 2, 3 and 5 shall not commence until, for that numbered work, details of the layout, scale and external appearance of the numbered work have been submitted to and approved by the relevant planning authority.\n(6) In respect of numbered work 6a, the undertaker must utilise horizontal directional drilling as the installation method where the numbered work crosses the A140.\n(7) No part of numbered work 6a must commence until a method statement detailing measures to protect the integrity of the A140 from horizontal directional drilling or activities associated therewith has been submitted to and approved by the highway authority. The method statement must be implemented as approved.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Sch. 2 Table 2 substituted (12.11.2016) by The Progress Power (Gas Fired Power Station) (Amendment) Order 2016 (S.I. 2016/1086), arts. 1, 4, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 3 in force at 14.8.2015, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1570/schedule/2/paragraph/3",
    "retrieved_at": "2026-10-28T23:33:20.397524+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}