Schedule 1 THE SCHEDULED WORKS
In the city of Leeds–
-
Work No. 1 – A reconstruction and widening of the bridge carrying the railways at Leeds North Junction over Globe Road, including a widening of the north western side of that bridge to an extent of 1 metre, and a widening of the south eastern side of that bridge to an extent of 5 metres.
-
Work No. 2 – A redecking over of the gap between the span of the southern bridge carrying the railway at Whitehall sidings over Whitehall Road, the reconstruction or strengthening of that span and the widening of the north eastern side of that bridge to an extent of 3 metres.
-
Work No. 3 – A redecking over of the gaps between the spans of the bridges carrying the railway at Whitehall sidings over the northbound and southbound carriageways of the A58 (Gelderd Road/former Spence Lane), the reconstruction or strengthening of those spans and the widening of the south eastern and north western sides of those bridges to an extent of 1 metre.