  "heading": "THE SCHEDULED WORKS",
  "text": "In this Schedule references to “the Catford Loop Lines” are to the railway between Nunhead and Shortlands and references to “the Chatham Main Lines”, “the Chatham Lines”, “the Chatham Fast Line” and “the Chatham Slow Line” are to the railway between London Victoria and Chatham.\nIn the London Borough of Bromley—\nWork No. 1—A railway (1,045 metres in length) commencing by a junction with the Catford Loop Lines at a point 343 metres north of the northern side of the bridge (number 490) carrying Downs Hill over that railway, passing southwards beneath that road, then passing through a reinforced concrete tunnel box under the Chatham Lines between Beckenham Junction and Shortlands Stations and terminating by a junction with the up Chatham Fast Line at Shortlands Station at a point 61 metres south-east of the southern side of the bridge (number 55) carrying that up fast line over Beckenham Lane, including the said tunnel box and the provision of a reinforced concrete box at the western end of the said bridge carrying Downs Hill so as to carry the railway under that road.\nWork No. 1A—A railway (302 metres in length), forming a connection between Work No. 1 and the down Chatham Fast Line, commencing by a junction with Work No.1 at a point 232 metres north-west of the western side of the bridge (number 55) carrying the said down fast line over Beckenham Lane, passing south-eastwards and terminating by a junction with that down fast line at Shortlands Station at a point 53 metres south-east of the southern side of the said bridge number 55.\nWork No. 2—A railway (442 metres in length), being a realignment of the Catford Loop Lines, commencing by a junction with Work No.1 at a point 10 metres south-east of its commencement, passing southwards beneath Downs Hill, and terminating by a junction with the Catford Loop Lines at a point 97 metres south-east of the southern side of the bridge (number 490) carrying Downs Hill over that railway.\nWork No. 3—A railway (690 metres in length), being a realignment of the Chatham Fast Lines between Beckenham Junction and Shortlands Stations, commencing by a junction with the Chatham Main Lines at a point 6 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the said railway, passing eastwards then south-eastwards and terminating by a junction with Work No.1 at a point 4 metres north-west of the northern side of the bridge (number 55) carrying the up Chatham Fast Line over Beckenham Lane, including a subway under the railway to gain access for maintenance purposes.\nWork No. 4—A railway (401 metres in length), being a raising of the Chatham Slow Lines, commencing by a junction with the Chatham Main Lines at a point 6 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the said railway, passing eastwards over the tunnel box comprised in Work No. 1 and terminating by a junction with the Chatham Slow Lines at a point 395 metres east of the eastern side of the said bridge number 54.\nWork No. 4A—A railway (357 metres in length), forming a connection between the up Chatham Slow Line and the down Chatham Fast Line, commencing by a junction with Work No. 4 at a point 359 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the Chatham Lines, passing south-eastwards and terminating by a junction with Work No. 1A at a point 4 metres north-west of the bridge (number 55) carrying the down Chatham Fast Line over Beckenham Lane.\nWork No. 5A—An access road, including a reconstruction of the existing access to 31 Downs Hill, commencing at the junction of that access with Downs Hill, passing south-eastwards and terminating at a point 133 metres south-east of its commencement.\nWork No. 5B—An access road for construction purposes, commencing by a junction with the access road (Work No. 5A) at its commencement, passing southwards and terminating at a point 83 metres south of its commencement.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2001/2870/schedule/1",
    "retrieved_at": "2026-10-29T07:30:30.923166+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}