# The Railways and Other Transport Systems (Approval of Works, Plant and Equipment) Regulations 1994, Part III—: MOVEABLE PLANT AND EQUIPMENT


Applications for the approval of moveable plant and (or) equipment shall be accompanied by:
(a) a written description of the proposed plant and (or) equipment;
(b) an outline of the specifications to which the proposed plant and (or) equipment is to be constructed;
(c) a statement of the level of safety provided by the proposal;
(d) written details of the proposed use and method of operation;
(e) general arrangement drawings including interior layouts as appropriate;
(f) written details of the loading limits and forces imposed upon the supporting structure;
(g) written details of the measures incorporated in the plant and (or) equipment to minimise risk of damage and injury in an accident.

---
Source: https://www.legislation.gov.uk/uksi/1994/157/schedule/2/part/III (the official version)
Page: https://openlegislation.uk/railways-and-other-transport-systems-approval-of-works-plant-and-equipment-regulations-1994/schedule-2/part-III
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

