# The Railways (Interoperability) (High-Speed) Regulations 2002, Paragraph 2: EC verification


The subsystem is checked at each of the following stages:
overall design;
structure of subsystem, including, in particular, civil-engineering activities, constituent assembly, overall adjustment;
final testing of the subsystem.

---