# The Railways (Interoperability) (High-Speed) Regulations 2002, Paragraph 5.1: EC verification


The aim of EC monitoring is to ensure that the obligations deriving from the technical record have been met during production of the subsystem.

---
Source: https://www.legislation.gov.uk/uksi/2002/1166/schedule/6/paragraph/5.1 (the official version)
Page: https://openlegislation.uk/railways-interoperability-high-speed-regulations-2002/schedule-6/paragraph-5.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

