  "text": "A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act which is located in the English Channel approximately 13 kilometres to the south of the Sussex coast, comprising works to be carried out in the areas shown on the offshore works plans and onshore works plans—\nWork No. 1—\nan offshore wind turbine generating station with a gross electrical output of over 100 megawatts and comprising up to 90 wind turbine generators, with each wind turbine fixed to the seabed by either monopile foundation or multileg foundation and including a connection to the subsea cable circuits comprising Work No. 2(a) or 2(b).\nWork No. 2—\n(a) a network of subsea cable circuits between the wind turbine generators comprising Work No. 1;\n(b) a network of subsea cable circuits between the wind turbine generators comprising Work No. 1 and the offshore substations comprising Work No. 3(a) including one or more cable crossings; and\n(c) connections into the offshore substations comprising Work No. 3(a).\nWork No. 3—\n(a) up to three offshore substations each fixed to the seabed by monopile foundation, or multileg foundation and including connection to the cable circuits comprising Work No. 2(b), cable circuits comprising Work No. 3(b) and cable circuits comprising Work No. 4; and\n(b) up to two offshore subsea cable circuits in total each connecting one offshore substation to another,\nand associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising—\nWork No. 4—\nup to four cable circuits in total between and connecting one or more of the offshore substations comprising Work No. 3(a) and the cable circuits comprising Work No. 5 (b) laid on or beneath the seabed within the offshore Order limits seaward of MLWS.\nWork No. 5—\n(a) up to four temporary horizontal directional drilling exit pits located seaward of MLWS; and\n(b) up to four cable circuits and associated ducts connecting the cable circuits comprising Work No. 4 and the cable circuits comprising Work No. 6 laid on or beneath the seabed or in ducts laid on or beneath the seabed within the offshore Order limits.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 1 Pt. 1 para. 1 inserted (24.4.2026) by The Rampion 2 Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/465), art. 1, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 1 in force at 28.4.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/468/schedule/1/part/1/paragraph/1n1",
    "retrieved_at": "2026-10-28T21:17:16.550102+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}