# The Rampion 2 Offshore Wind Farm Order 2025, Paragraph 5: General

Extent: E+W+S

References to any standards, manuals, contracts, regulations and directives including to specific standards forming part of the DMRB are, for the purposes of this Part of this Schedule, to be construed as a reference to the same as amended, substituted or replaced, and with such modifications as are required in those circumstances.

---