# The Rampion Offshore Wind Farm Order 2014, Article 2: Interpretation

Extent: E+W+S

(1) In this Order—
“the 1961 Act” means the Land Compensation Act 1961;
“the 1965 Act” means the Compulsory Purchase Act 1965;
“the 1980 Act” means the Highways Act 1980;
“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981;
“the 1990 Act” means the Town and Country Planning Act 1990;
“the 1991 Act” means the New Roads and Street Works Act 1991;
“the 2004 Act” means the Energy Act 2004;
“the 2008 Act” means the Planning Act 2008;
“the 2009 Act” means the Marine and Coastal Access Act 2009;
“access land” has the same meaning as in Part 1 of the Countryside and Rights of Way Act 2000;
“access to works plan” means the plan certified as the access to works plan by the Secretary of State for the purposes of this Order;
“ancillary works” means the ancillary works described in Part 2 of Schedule 1 (ancillary works) and which are not development within the meaning of section 32 of the 2008 Act;
“approval authority” means a person or body that is responsible for approving details pursuant to a requirement in Part 3 of Schedule 1 (requirements);
“array” means Work Nos. 1 and 2;
“authorised development” means the development and associated development described in Part 1 of Schedule 1 (authorised development), which is development within the meaning of section 32 of the 2008 Act;
“authorised project” means the authorised development and the ancillary works authorised by this Order;
“book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;
“building” includes any structure or erection or any part of a building, structure or erection;
“cable ducts” means conduits for the installation of cables;
“carriageway” has the same meaning as in the 1980 Act;
“circuit” means up to three cables installed inside separate cable ducts, which are grouped together in a trefoil arrangement;
“commence”, unless otherwise provided for, means—
(a)in relation to works seaward of MHWS, beginning to carry out any licensed marine activities authorised by the deemed marine licences other than pre-construction surveys or monitoring;
(b)in respect of any other works comprised in the authorised project, any material operation (as defined in section 56(4) of the 1990 Act) forming part of the authorised project other than operations consisting of site clearance (excluding stripping of soil and the removal of trees and hedgerows), demolition work, archaeological investigations, environmental surveys, investigations for the purpose of assessing ground conditions, remedial work in respect of any contamination or other adverse ground conditions, diversion and laying of services, erection of any temporary means of enclosure, the temporary display of site notices or advertisements,
and “commencement” shall be construed accordingly;
“connection works” means Work Nos. 3B to 32 and any related further associated development including, in relation to cable laying, jointing bays, manholes, marker posts and other works associated with cable laying;
“construction compound” means a secure construction site associated with the connection works including hard standings, lay down and storage areas for construction materials and equipment, areas for spoil, areas for vehicular parking, bunded storage areas, areas for welfare facilities including offices and canteen and washroom facilities, workshop facilities and temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;
“construction laydown area” means a temporary secure storage area associated with the connection works that is moveable and positioned at locations along the working width, for materials, plant and equipment, which may include vehicle parking, wheel washing facilities and mobile units comprising access control room and welfare facilities;
“deemed array marine licence” means the licence set out in Schedule 13 (deemed licence under the Marine and Coastal Access Act 2009 – array) and deemed by article 11 (deemed marine licences under the Marine and Coastal Access Act 2009) to have been granted under Part 4 of the 2009 Act, by virtue of section 149A of the 2008 Act;
“deemed export cables marine licence” means the licence set out in Schedule 14 (deemed licences under the Marine and Coastal Access Act 2009 – export cables) and deemed by article 11 (deemed marine licence under the Marine and Coastal Access Act 2009) to have been granted under Part 4 of the 2009 Act, by virtue of section 149A of the 2008 Act;
“deemed marine licences” means one or both of the deemed array marine licence and the deemed export cables marine licence;
“environmental statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order and submitted with the application on 1 March 2013;
“European protected species” has the same meaning as in regulations 42 and 46 of the Conservation of Habitats and Species Regulations 2017;
“export cables”, except where otherwise provided for, means Work No. 3A;
“footpath stopping up and diversion plan” means the plan certified as the footpath stopping up and diversion plan by the Secretary of State for the purposes of this Order;
“gravity base foundation” means a structure principally of concrete, steel or steel and concrete which rests on the seabed either due to its own weight with or without added ballast or skirts, including associated sea bed preparation, scour protection, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side and work platforms and equipment;
“highway” and “highway authority” have the same meaning as in the 1980 Act;
“horizontal directional drilling compound” means a secure construction site associated with the connection works where horizontal directional drilling is proposed including hard standings, lay down and storage areas for construction materials and equipment, areas for spoil, areas for vehicular parking, bunded storage areas, areas for welfare facilities including offices and canteen and washroom facilities, wheel washing facilities, workshop facilities and temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;
“horizontal directional drilling exit compound” means a secure construction site associated with the connection works at the exit point where horizontal directional drilling is proposed including hard standings, lay down and storage areas for construction materials and equipment, areas for temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;
“Hydrographic Office” means the United Kingdom Hydrographic Office of Admiralty Way, Taunton, Somerset, TA1 2DN;
“IBGS foundation” means an Inward Battered Guide Structure foundation, a jacket-type concrete, steel or steel and concrete structure which is pre-fabricated with three tubular raking legs, which is installed over a pre-driven central pile, with up to three smaller diameter raking piles driven through the legs to pin the foundation to the seabed, including associated scour protection, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side, access and work platforms and equipment;
“important hedgerows plan” means the plan certified as the important hedgerows plan by the Secretary of State for the purposes of this Order;
“jacket foundation” means a jacket/lattice type structure constructed of concrete, steel or steel and concrete which is fixed to the seabed at three or more points with driven or pre-installed piles or suction cans, including associated scour protection, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side, access and work platforms and equipment;
“land plan” means the plan certified as the land plan by the Secretary of State for the purposes of this Order;
“LAT” means lowest astronomical tide;
“maintain”, unless otherwise provided for, includes inspect, repair, adjust and alter, and further includes remove, reconstruct and replace any of the ancillary works and any component part of any wind turbine generator or offshore substation described in Part 1 of Schedule 1 (authorised development) to the extent assessed in the environmental statement, and “maintenance” and related expressions shall be construed accordingly;
“mean high water springs” or “MHWS” means the highest level which spring tides reach on average over a period of time;
“mean low water springs” or “MLWS” means the lowest level which spring tides reach on average over a period of time;
“measures of success for discharge of requirements” means the document certified as the measures of success for discharge of requirements by the Secretary of State for the purposes of this Order;
“MMO” means the Marine Management Organisation;
“monopile foundation” means a steel, concrete, or steel and concrete large diameter pile, typically cylindrical, driven and/or drilled into the seabed, including associated scour protection, transition piece, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side, access and work platforms and equipment;
“offshore substation” means an offshore platform constructed of steel or concrete or steel and concrete with single or multiple decks housing major electrical equipment including high voltage transformers, switchgear, control rooms, cabling and busbars, lightning protection masts, communications masts, cable management, back-up generators, fuel storage, emergency accommodation, workshops and stores, helihoist facilities, cranes and other associated electrical and ancillary equipment;
“onshore substation” means an onshore substation facility accommodated within a compound containing electrical equipment including high voltage transformers, switchgear, reactive compensation equipment, harmonic filters, cables, lightning protection masts, control buildings, communications masts, back-up generators, fuel storage, access roads, car parking and hardstanding, fencing and other associated equipment and structures;
“onshore substation design and access statement” means the document certified as the onshore substation design and access statement by the Secretary of State for the purposes of this Order;
“open access land plan” means the plan certified as the open access land plan by the Secretary of State for the purposes of this Order;
“Order land” means the land shown on the land plan which is within the limits of land to be acquired or used and described in the book of reference;
“Order limits”, unless otherwise provided for, means the limits shown on the works plan within which the authorised project may be carried out, whose grid coordinates seaward of MHWS are set out in paragraph 2 of Part 1 of Schedule 1 (authorised development);
“outline arboricultural method statement” means the document certified as the outline arboricultural method statement by the Secretary of State for the purposes of this Order;
“outline cable specification and installation plan” means the document certified as the outline cable specification and installation plan by the Secretary of State for the purposes of this Order;
“outline construction environmental management plan” means the document certified as the outline construction environmental management plan by the Secretary of State for the purposes of this Order;
“outline construction noise management plan” means the document certified as the outline construction noise management plan by the Secretary of State for the purposes of this Order;
“outline construction traffic management plan” means the document certified as the outline construction traffic management plan by the Secretary of State for the purposes of this Order;
“outline diver mitigation plan” means the document certified as the outline diver mitigation plan by the Secretary of State for the purposes of this Order;
“outline ecological and landscape management plan” means the document certified as the outline ecological and landscape management plan by the Secretary of State for the purposes of this Order;
“outline fisheries liaison strategy” means the document certified as the outline fisheries liaison strategy by the Secretary of State for the purposes of this Order;
“outline hedgerows management plan” means the document certified as the outline hedgerows management plan by the Secretary of State for the purposes of this Order;
“outline offshore written scheme of archaeological investigation” means the document certified as the outline offshore written scheme of archaeological investigation by the Secretary of State for the purposes of this Order;
“outline onshore written scheme of archaeological investigation” means the document certified as the outline onshore written scheme of archaeological investigation by the Secretary of State for the purposes of this Order;
“outline scour protection management and cable armouring plan” means the document certified as the outline scour protection management and cable armouring plan by the Secretary of State for the purposes of this Order;
“owner”, in relation to land, has the same meaning as in Section 7 of the Acquisition of Land Act 1981;
“piling restriction plan” means the plan certified as the piling restriction plan by the Secretary of State for the purposes of this Order;
“public rights of way strategy” means the document certified as the public rights of way strategy by the Secretary State for the purposes of this Order;
“public rights of way temporary closure plan” means the plan certified as the public rights of way temporary closure plan by the Secretary of State for the purposes of this Order;
“relevant highway authority” means West Sussex County Council;
“relevant planning authority” means the authority as specified in requirements 9 to 42, being West Sussex County Council, the South Downs National Park Authority or Mid Sussex District Council;
“requirements” means those matters set out in Part 3 of Schedule 1 (requirements) to this Order;
“revised footpath stopping up and diversion plan” means the plan dated 14 October 2020 and certified as the revised footpath stopping up and diversion plan by the Secretary of State for the purposes of this Order;
“statutory undertaker” means any person falling within section 127(8) of the 2008 Act;
“street” means a street within the meaning of section 48 of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;
“street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;
“suction can” means a steel cylindrical structure which is fixed to the base of the foundation and partially penetrates the seabed and remains in place using its own weight and hydrostatic pressure differential;
“suction caisson foundation” means a large diameter steel cylindrical structure which partially penetrates the seabed and remains in place using its own weight and hydrostatic pressure differential, attached to a vertical central column which supports the transition piece, including associated scour protection, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side, access platform(s) and equipment;
“the tribunal” means the Lands Chamber of the Upper Tribunal;
“transition pit” means an underground pit where the offshore export cables comprised in Work No. 3A are jointed to the connection works;
“tree preservation order plan” means the plan certified as the tree preservation order plan by the Secretary of State for the purposes of this Order;
“Trinity House” means The Corporation of Trinity House of Deptford Strond;
“tripod foundation” means a steel or concrete or steel and concrete jacket/lattice type structure consisting of three main legs linked by cross-braces supporting a single central support for the transition piece which is fixed to the seabed with driven or pre-installed piles or suction cans, including associated scour protection, J-tubes, corrosion protection systems, boat landings comprising an access ladder with vertical boat fenders fitted either side, access and work platforms and equipment;
“undertaker” means E.ON Climate & Renewables UK Rampion Offshore Wind Limited;
“vessel” includes every description of vessel, however propelled or moved, and includes a jack-up barge, floating crane, non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in, on or over water and which is at the time in, on or over water;
“watercourse” includes all rivers, streams, ditches, drains, creeks, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain;
“wind turbine generator” or “ WTG” means a structure comprising a tower, rotor with three horizontal axis blades connected at the hub, nacelle containing mechanical and electrical equipment, ancillary equipment including access ladders and platforms, lifts, cables, corrosion protection systems, maintenance equipment, helihoist facilities and other associated equipment, fixed to a foundation;
“working width” means the construction width of the onshore cable corridor including haul route, spoil storage and temporary drainage during installation of circuits and/or cable ducts; and
“works plan” means the plan certified as the works plan by the Secretary of State for the purposes of the Order.
(2) References in this Order to rights over land include references to rights to do or to place and maintain, anything in, on or under land or in the air-space above its surface.
(3) All distances, directions and lengths referred to in this Order are approximate, save in respect of the parameters referred to requirements 2 to 5 and 10, conditions 1 to 4 in Part 2 of the deemed array marine licence and condition 1 in Part 2 of the deemed export cables marine licence.
(4) Any reference in this Order to a work identified by the number of the work is to be construed as a reference to the work of that number authorised by Part 1 of Schedule 1 to this Order, except that references to Works No.1 to 3A in Schedules 13 and 14 shall be construed in accordance with the provisions of those Schedules.
(5) Unless otherwise stated, references in this Order to points identified by letters are to be construed as references to the points so lettered on the works plan.

---
Source: https://www.legislation.gov.uk/uksi/2014/1873/article/2 (the official version)