  "heading": "Certification of plans etc",
  "text": "(1) The undertaker shall, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—\n(a) the works plan comprising of—\ndocument reference 2.5 dated 14 February 2013;\ndocument reference 2.5.1/v3 dated 19 December 2013;\ndocument reference 2.5.2 sheets 1-11 dated 11 December 2012; and\ndocument reference 2.5.2 sheet 12 dated 14 February 2013;\n(b) the land plan comprising of—\ndocument reference 2.2 dated 14 February 2013;\ndocument reference 2.2.1 dated 12 December 2012; and\ndocument reference 2.2.2 sheets 1-12 dated 19 February 2013;\n(c) the public rights of way temporary closure plan comprising of—\ndocument reference 2.9 dated 14 February 2013;\ndocument reference 2.9 sheets 1-5 and 7-11 dated 10 December 2012;\ndocument reference 2.9 sheet 6 dated 3 June 2013; and\ndocument reference 2.9 sheet 12 dated 14 February 2013;\n(d) the footpath stopping up and diversion plan (document reference 2.8 dated 14 February 2013);\n(e) the open access land plan comprising of—\ndocument reference 2.16 dated 14 February 2013; and\ndocument reference 2.16 sheets 1-3 dated 11 December 2012;\n(f) the important hedgerows plan comprising of—\ndocument reference 2.12 dated 14 February 2013;\ndocument reference 2.12/v2 sheets 1-7 and 10-12 dated 9 August 2013; and\ndocument reference 2.12/v2 sheets 8-9 dated 6 December 2013;\n(g) the tree preservation order plan (document reference 2.17 dated 10 December 2012);\n(h) the access to works plan comprising of—\ndocument reference 2.7 dated 14 February 2013;\ndocument reference 2.7 sheets 1-11 dated 11 December 2012; and\ndocument reference 2.7 sheet 12 dated 14 February 2013;\n(i) the piling restriction plan (Rev 02 dated 19 December 2013);\n(j) the book of reference (January 2014 – Version 4);\n(k) the environmental statement (comprising of all document references in the series 6.1-6.4);\n(l) the outline onshore written scheme of archaeological investigation (December 2013 – Version 2);\n(m) the outline offshore written scheme of archaeological investigation (November 2013 – Version 1);\n(n) the outline construction traffic management plan (January 2014 – Version 2);\n(o) the outline ecological and landscape management plan (November 2013 – Version 2);\n(p) the onshore substation design and access statement (November 2013 – Version 2);\n(q) the public rights of way strategy (document reference 8.3 dated March 2013);\n(r) the outline construction environmental management plan (October 2013 – Version 1);\n(s) the outline construction noise management plan (October 2013 – Version 1);\n(t) the outline diver mitigation plan (October 2013 – Version 1);\n(u) the outline arboricultural method statement (November 2013 – Version 2);\n(v) the outline hedgerows management plan (November 2013 – Version 2);\n(w) the outline scour protection management and cable armouring plan (3 December 2013 – Version 2);\n(x) the outline Tottington Mount management plan (October 2013 – Version 1);\n(y) the outline cable specification and installation plan (26 November 2013 – Version 2);\n(z) the outline fisheries liaison strategy (January 2014 – Version 1); and\n(aa) measures of success for discharge of requirements (January 2014 – Version 1),\nfor certification that they are true copies of the documents referred to in this Order.\n(2) A plan or document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.\n(3) Where a plan or document certified under paragraph (1)—\n(a) refers to a provision of this Order (including any specified requirement) when it was in draft form; and\n(b) identifies that provision by a number, or combination of numbers and letters, which is different from the number, or combination of numbers and letters by which the corresponding provision of this Order is identified in the Order as made,\nthe reference in the plan or document concerned shall be construed for the purposes of this Order as referring to the provision (if any) corresponding to that provision in the Order as made.\n(4) In this article, document reference numbers refer to the references given by the undertaker to the documents it submitted to the Secretary of State.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in art. 40(1)(x) substituted (14.5.2015) by The Rampion Offshore Wind Farm (Correction) Order 2015 (S.I. 2015/1319), art. 1, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 40 in force at 6.8.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/1873/article/40",
    "retrieved_at": "2026-10-29T00:09:38.375631+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}