  "url": "https://openlegislation.uk/rampion-offshore-wind-farm-order-2014/schedule-14/part-2/paragraph-5",
  "json_url": "https://openlegislation.uk/rampion-offshore-wind-farm-order-2014/schedule-14/part-2/paragraph-5.json",
  "legislation": "uksi/2014/1873",
  "legislation_title": "The Rampion Offshore Wind Farm Order 2014",
  "legislation_url": "https://openlegislation.uk/rampion-offshore-wind-farm-order-2014",
  "path": "schedule/14/part/2/paragraph/5",
  "kind": "paragraph",
  "number": "5",
  "heading": "Chemicals, drilling and debris",
  "text": "(1) Unless otherwise agreed in writing by the MMO all chemicals used in the construction of the authorised scheme shall be selected from the List of Notified Chemicals approved for use by the offshore oil and gas industry under the Offshore Chemicals Regulations 2002.\n(2) The undertaker shall ensure that any coatings/treatments are suitable for use in the marine environment and are used in accordance with guidelines approved by Health and Safety Executive and the Environment Agency Pollution Prevention Control Guidelines.\n(3) The storage, handling, transport and use of fuels, lubricants, chemicals and other substances shall be undertaken so as to prevent releases into the marine environment, including bunding of 110% of the total volume of all reservoirs and containers.\n(4) The undertaker shall ensure that any debris arising from the construction of the authorised scheme or temporary works placed below MHWS are removed on completion of the authorised scheme.\n(5) At least two months prior to the commencement of the licensed activities the undertaker shall submit to the MMO an audit sheet covering all aspects of the construction of the licenced activities or any part of them, which shall include details of—\n(a) loading facilities;\n(b) vessels;\n(c) equipment;\n(d) shipment routes;\n(e) working schedules; and\n(f) all components and materials to be used in the construction of the authorised scheme.\n(6) The audit sheet shall be maintained throughout the construction of the authorised scheme (or relevant part) and any changes notified immediately in writing to the MMO which must give written approval prior to any change being implemented.\n(7) In the event that the MMO becomes aware that any of the materials on the audit sheet cannot be accounted for it shall—\n(a) require the undertaker to carry out a side scan sonar survey to plot all obstructions across the relevant area(s) within the Order limits seaward of MHWS where construction works and related activities related to those materials have been carried out and, if the initial survey does not locate the missing materials, over such wider area as the MMO may reasonably request;\n(b) invite local fishermen to send a representative to be present during the survey, and\nany new obstructions that the MMO believes to be associated with the authorised scheme shall be removed at the undertaker’s expense.\n(8) The undertaker shall ensure that any rock material used in the construction of the authorised scheme is from a recognised source, free from contaminants and containing minimal fines.\n(9) In the event that any rock material used in the construction of the authorised scheme is misplaced or lost below MHWS, the undertaker shall report the loss to the MMO’s District Marine Office within 48 hours and if the MMO shall reasonably consider such material to constitute a navigation or environmental hazard (dependent on the size and nature of the material) the undertaker shall endeavour to locate the material and recover it.\n(10) The undertaker shall undertake the methods agreed under 7(1)(g)(iii) following the high resolution swath bathymetric survey referred to in condition 13(3)(a), and should any such obstructions resulting from burial of the export cables be identified which, in the reasonable opinion of the MMO, may be considered to interfere with fishing, the undertaker shall take such steps to remove them as the MMO in its reasonable opinion shall require.\n(11) The undertaker shall ensure that any oil, fuel or chemical spill within the marine environment is reported to the MMO, Marine Pollution Response Team.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 14 Pt. 2 para. 5 in force at 6.8.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/1873/schedule/14/part/2/paragraph/5",
    "retrieved_at": "2026-10-29T00:09:38.375631+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}