Work No.4B the undergrounding of 11kV and 33kV cables between Oswestry and Wem as shown on sheets 1, 2, 3, 7, 8, 9, 12, 13, 14 and 16 of the works plans and—
(a) site preparation works and site clearance (including fencing, felling and vegetation removal);
(b) earthworks (including soil stripping and storage and site levelling);
(c) carrying out surveys or taking soil samples;
(d) establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;
(e) cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;
(f) reinstatement hedgerow planting;
(g) establishment of temporary means of access and trackways;
(h) drainage works;
(i) works to alter ramps, means of access, footpaths and bridleways;
(j) works to alter the position of apparatus, including mains, sewers, drains and cables;
(k) works to alter the course of, or otherwise interfere with a watercourse;
(l) works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
(m) works for the benefit or protection of land affected by the authorised development;
(n) establishment of winching points and the installation of scaffolding;
(o) works to install the means to connect the lower voltage overhead line (Work No.4A) with the new section of lower voltage underground cable.

---
Source: https://www.legislation.gov.uk/uksi/2020/325/schedule/1/part/4/chapter/paragraph/wrapper6n1 (the official version)
Page: https://openlegislation.uk/reinforcement-to-the-north-shropshire-electricity-distribution-network-order-2020/schedule-1/part-4/chapter/paragraph-wrapper6n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.