# The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020, Paragraph 67: Interpretation

Extent: E+W

(1) Where terms defined in article 2 are inconsistent with the terms defined in sub-paragraph (2) below, the latter prevail.
(2) In this Part of this Schedule—
“the contractor” means any contractor or sub-contractor appointed by the undertaker to construct the HE works;
“the detailed design information” means details of the following where applicable to the HE works—
(a)site clearance details;
(b)boundary and mitigation fencing;
(c)road restraints systems and supporting road restraint risk appraisal process assessment;
(d)drainage and ducting and supporting drainage calculations;
(e)earthworks including supporting geotechnical assessments and any required strengthened earthworks appraisal form certification;
(f)kerbs, footways and paved areas;
(g)traffic signs and road markings;
(h)traffic signal equipment and associated signal phasing and timing detail;
(i)road lighting (including columns and brackets) and supporting lighting calculations;
(j)electrical work for road lighting, traffic signs and signals;
(k)highway structures and any required structural approval in principle;
(l)landscaping;
(m)proposed departures from DMRB requirements;
(n)utilities diversions;
(o)topographical survey;
(p)site waste management plan;
(q)maintenance and repair strategy in accordance with Designing for Maintenance Interim Advice Note 69/15 or any replacement or modification of it;
(r)asbestos survey;
(s)regime of core testing and sampling of existing trunk road pavement construction;
(t)site investigation survey;
(u)health and safety information; and
(v)other such information used to inform the detailed design of the HE works that may be required by Highways England;
“DMRB” means the Design Manual for Roads and Bridges or any replacement or modification of it;
“the estimated costs” means the estimated costs in respect of the HE works agreed pursuant to paragraph 70 of this Schedule;
“the HE works” means the part of Work No.2 of the authorised development which directly affects the A5(T) near Long Wood at Middleton being the directional drilling and installation of an underground cable conduit and 132kV cable under the A5(T);
“the nominated persons” means the undertaker's representatives or the contractor's representatives on site during construction of the HE works, as notified to Highways England from time to time;
“the programme of works” means a document setting out the sequence and timetabling of the HE works; and
“utilities” means any pipes, wires, cables or other equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act.

---
Source: https://www.legislation.gov.uk/uksi/2020/325/schedule/6/paragraph/67 (the official version)