  "url": "https://openlegislation.uk/renewable-heat-incentive-scheme-regulations-2018/schedule-2A/paragraph-5",
  "json_url": "https://openlegislation.uk/renewable-heat-incentive-scheme-regulations-2018/schedule-2A/paragraph-5.json",
  "legislation": "uksi/2018/611",
  "legislation_title": "The Renewable Heat Incentive Scheme Regulations 2018",
  "legislation_url": "https://openlegislation.uk/renewable-heat-incentive-scheme-regulations-2018",
  "path": "schedule/2A/paragraph/5",
  "kind": "paragraph",
  "number": "5",
  "heading": "Estimated cost of works",
  "text": "(1) For the purpose of paragraph 3(d), an estimated cost of works must contain the information required by this paragraph.\n(2) The information does not need to be contained in a single document but may be contained in multiple documents.\n(3) An estimated cost of works must contain—\n(a) the legal identity and address of the person providing the estimated cost of works;\n(b) the project name; and\n(c) the proposed location of the plant.\n(4) In addition, an estimated cost of works must contain at least 7 of the following pieces of information—\n(a) the source of energy, technology and proposed installation capacity (in kWth) of the plant;\n(b) key contract terms;\n(c) itemised list of goods to be supplied and itemised list of costs for these goods;\n(d) itemised list of services (including survey, design and installation) and itemised list of costs for these services;\n(e) a statement of the items and services that are not included;\n(f) a statement of the site conditions or special circumstances which may result in extra chargeable work;\n(g) timetable for supplying goods and carrying out work at the site;\n(h) business terms, including the payment method and timetable, and how long the quote will be valid for;\n(i) completion dates for the plant;\n(j) performance estimate in line with product standards;\n(k) explanation of VAT specific to the plant;\n(l) carbon intensity comparisons specific to the plant;\n(m) illustrations of expected rates of return specific to the plant;\n(n) warranty statements.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Sch. 2A inserted (1.3.2021) by The Domestic Renewable Heat Incentive Scheme and Renewable Heat Incentive Scheme (Amendment) Regulations 2021 (S.I. 2021/76), regs. 1(2)(b)(vii), 38"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2018/611/schedule/2A/paragraph/5",
    "retrieved_at": "2026-10-28T22:57:48.394569+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}