{
  "url": "https://openlegislation.uk/renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-3",
  "json_url": "https://openlegislation.uk/renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-3.json",
  "legislation": "uksi/2026/1171",
  "legislation_title": "The Renewables Obligation and Electricity Capacity (Amendment) (British Industrial Competitiveness Scheme Excluded Electricity) Regulations 2026",
  "legislation_url": "https://openlegislation.uk/renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026",
  "path": "regulation/3",
  "kind": "regulation",
  "number": "3",
  "heading": "Interpretation",
  "text": "(1) In these Regulations—\n“the 2015 Order” means the Renewables Obligation Order 2015;\n“the Balancing and Settlement Code” has the meaning given in the ESO Regulations;\n“BICS applicant” means a person making a BICS application and, where a BICS determination is in force, the person in respect of whom that determination was made;\n“BICS application” means an application under regulation 7;\n“BICS determination” has the meaning given in regulation 6(1);\n“BICS excluded electricity” means any amount of electricity determined to be such in accordance with regulation 5;\n“BICS year” means—\n(a) in relation to a renewables obligation order, the period beginning on 1st April 2027 and ending on 31st March 2028 and each subsequent period of 12 months, and\n(b) in relation to electricity capacity regulations, the period beginning on 1st October 2027 and ending on 30th September 2028 and each subsequent period of 12 months;\n“BM Unit Identification Number”, “CMRS”, “MSID” and “SMRS” are to be construed in accordance with the Balancing and Settlement Code (see Sections X-1 and X-2 of that code);\n“the BSCCo” has the meaning given in regulation 2(1) of the ESO Regulations;\n“BSC volume allocation run” has the meaning given in regulation 2(1) of the ESO Regulations;\n“EII certificate” has the meaning given in regulation 8(1) of the Electricity Supplier Obligations (Amendment & Excluded Electricity) Regulations 2015;\n“electricity supplier” means a person who is the holder of a licence to supply electricity under section 6(1)(d) of the Electricity Act 1989;\n“ESO Regulations” means the Contracts for Difference (Electricity Supplier Obligations) Regulations 2014;\n“firm” has the meaning given in section 1173(1) of the Companies Act 2006;\n“FIT Scheme” has the meaning given in Schedule A to Standard Condition 33 in the standard conditions of electricity supply licences;\n“manufacturing site” means an area in Great Britain at which a person, who has control over, or use of, the area, carries out the manufacture, production or processing of any product or substance and, for these purposes—\n(a) all places adjoining each other under the control of, or used by, that person are to be treated as an area, and\n(b) two or more areas under the control of, or used by, that person separated only by a road, railway or inland waterway are to be treated as a single area;\n“non-specified activity” means the manufacture, production or processing of any product or substance, except where the manufacture, production or processing of the product or substance is a specified activity;\n“officer” has the meaning given in section 1173(1) of the Companies Act 2006;\n“related activity” means any activity carried out at a manufacturing site which is necessary for, ancillary or incidental to, or which enables or supports the carrying out of a manufacturing or production activity including, but not limited to, research and development activities and testing materials, substances, components or articles;\n“Settlement Body” means the person appointed to that position under regulation 80 of the Electricity Capacity Regulations 2014;\n“specified activity” has the meaning given in regulation 4;\n“Supplier Payment (Amendment and Excluded Electricity) Regulations” means the Electricity Capacity (Supplier Payment etc.) (Amendment and Excluded Electricity) Regulations 2024;\n“Supplier Payment Regulations” means the Electricity Capacity (Supplier Payment etc.) Regulations 2014;\n“year 2 review report” has the meaning given in regulation 11(1).\n(2) Any reference in these Regulations to—\n(a) a supply of electricity is a reference to its supply in Great Britain, and “supply” is to be construed in accordance with section 4(4) of the Electricity Act 1989, and\n(b) electricity meters in respect of a manufacturing site is a reference to meters which measure electricity supplied to that manufacturing site.\n(3) Any reference in these Regulations to an amount of electricity is a reference to that amount expressed in megawatt hours (MWh).",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "S.I. 2015/1947, amended by S.I. 2017/1289 and 2024/403; there are other amending instruments but none is relevant."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "The Balancing and Settlement Code is available at: https://bscdocs.elexon.co.uk/bsc. Information on how to obtain a hard copy may be obtained by contacting Elexon, 350 Euston Road, 4th Floor, London, NW1 3AW."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "S.I. 2015/721, amended by S.I. 2017/1051, 2020/130, 2023/415 and 2024/419; there are other amending instruments but none is relevant."
    },
    {
      "type": "footnote",
      "label": "f4",
      "text": "Section 6(1)(d) was amended by S.I. 2012/2400."
    },
    {
      "type": "footnote",
      "label": "f5",
      "text": "S.I. 2014/2014, to which there are amendments not relevant to this instrument."
    },
    {
      "type": "footnote",
      "label": "f6",
      "text": "2006 c. 46."
    },
    {
      "type": "footnote",
      "label": "f7",
      "text": "The Electricity Supply Licence Standard Conditions are available at: https://epr.ofgem.gov.uk/. Standard Condition 33 was inserted with effect from 1st April 2010, and the Schedule to Standard Condition 33 was substituted with effect from 1st December 2012, by modifications made under section 41 of the Energy Act 2008. Hard copies are available from the Department for Energy Security and Net Zero, 3-8 Whitehall Place, London SW1A 2EG."
    },
    {
      "type": "footnote",
      "label": "f8",
      "text": "S.I. 2014/2043, amended by S.I. 2014/3354, 2015/875, 2015/1974, 2016/742, 2017/1053, 2019/530, 2019/862, 2019/1139, 2020/697, 2020/1470, 2021/901 and 2023/860."
    },
    {
      "type": "footnote",
      "label": "f9",
      "text": "S.I. 2024/434."
    },
    {
      "type": "footnote",
      "label": "f10",
      "text": "S.I. 2014/3354, amended by S.I. 2015/875, 2016/742, 2017/1053, 2022/401 and 2024/434; there are other amendments and modifications, but none is relevant."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2026/1171/regulation/3",
    "retrieved_at": "2026-11-12T03:36:17.494532+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}