Article 2 Interpretation
In this Order—
-
“additional capacity” in relation to a small onshore wind generating station, means any generating capacity which does not form part of the original capacity of the station;
-
“grid or radar delay condition”, “approved development condition” and “investment freezing condition” have meanings given respectively by Articles 10, 11 and 12;
-
“small onshore wind generating station” means an onshore wind generating station where the total installed capacity of the station is not more than 5 megawatts;
-
“licensed network operator” means a distribution licence holder or a transmission licence holder;
-
“relevant developer”, in relation to a small onshore wind generating station or additional capacity, means a person who—
- (a)
applied for planning permission for the station or additional capacity,
- (b)
arranged for grid works to be carried out in relation to the station or additional capacity,
- (c)
arranged for the construction of any part of the station or additional capacity,
- (d)
constructed any part of the station or additional capacity, or
- (e)
operates, or proposes to operate, the station;
- (a)
Expressions used in this Order which are also used in the Renewables Obligation Closure Order (Northern Ireland) 2015f1 shall have the same meaning as in that Order.