# The Renewables Obligation Closure Order 2014, Article 11: Circumstances relating to certain offshore wind, gasification or pyrolysis generating stations notified to the Authority on or before the relevant date

Extent: E+W+S

The circumstances set out in this article are where the electricity is generated—
(a) using the original capacity of a generating station—
(i) which was accredited on or before 31st March 2018, and
(ii) in respect of which a notice of intent (within the meaning of article 13) was received by the Authority on or before the relevant date, and
(b) in the way described in Part 1 of Schedule 5 to the Renewables Obligation Order 2015 as—
(i) advanced gasification/pyrolysis,
(ii) offshore wind, or
(iii) standard gasification/pyrolysis.

---
Source: https://www.legislation.gov.uk/uksi/2014/2388/article/11 (the official version)