OpenLegislation

Paragraph 7

Original text. Later amendments are not shown.

The following information about the reservoir as it will be when constructed, or brought back into use as proposed—

(a)

category (i.e. whether impounding or non-impounding);

(b)

date(s) or approximate date(s) of completion of the dam(s), reservoir walls or embankments(s);

(c)

construction of the dam(s), reservoir walls or embankments(s) (i.e. whether constructed of earth, rockfill, gravity, buttress or by other means);

(d)

maximum height of the dam(s), reservoir walls or embankment(s) (in metres), measured from the lowest natural level of the surrounding land contiguous to it, to the top of the dam(s), reservoir walls or embankment(s), excluding the height of the wave wall;

(e)

the height of the dam(s), reservoir walls or embankment(s) (in metres) measured from the lowest natural level of the surrounding land contiguous to it to top water level;

(f)

the level of the top of the dam, the walls or embankment of the reservoir with reference to Ordnance Datum;

(g)

the top water level of the reservoir with reference to Ordnance Datum;

(h)

capacity (in cubic metres), measured from the lowest natural level of the surrounding land contiguous to it to top water level;

(i)

the water surface area at top water level (in square metres or square kilometres).