Schedule 17 FORM OF RECORD TO BE MAINTAINED UNDER SECTION 51(1) OF THE ACT
| Date | Depth of water flowing over waste weir or overflow (in metres) | Name, position and signature of engineer or other person responsible for the entry |
| Details of any action taken by SEPA under section 71 of the Act: | Date(s) when action taken: |