{
  "url": "https://openlegislation.uk/restrictive-trade-practices-standards-goods-order-1998/schedule",
  "json_url": "https://openlegislation.uk/restrictive-trade-practices-standards-goods-order-1998/schedule.json",
  "legislation": "uksi/1998/1395",
  "legislation_title": "The Restrictive Trade Practices (Standards) (Goods) Order 1998",
  "legislation_url": "https://openlegislation.uk/restrictive-trade-practices-standards-goods-order-1998",
  "path": "schedule",
  "kind": "schedule",
  "number": null,
  "heading": "STANDARDS",
  "text": "09-19\nSynthetic aromatic hydrocarbon insulating fluid for use in fluid-filled pressure-assisted cables up to 400kV operating voltage Issue 2, 1996\n09-22\nProtection of cable installations against the effects of fire Issue 1, 1997\n12-4\nTerminating equipment for pilot cables subject to induced transient voltages exceeding 650V rms Amendment 1, 1996 to Issue 1, 1973\n12-25\nCable trays Issue 1, 1997\n35-17\nClass X current transformers Issue 1, 1996\n41-26\nDistribution switchgear for service up to 36kV (cable connected) Amendment 3, 1997 to Issue 1, 1991\n41-27\nOutdoor distribution switchgear for service up to 36kV (overhead conductor connected) Amendment 3, 1997 to Issue 1, 1991\n43-2\nDesign of steel tower overhead transmission lines at 132kV and higher voltages Amendment 1, 1996 to Issue 1, 1972\n43-3\nDesign of lattice steel transmission towers for overhead lines at 132kV and higher voltages Amendment 1, 1996 to Issue 1, 1972\n43-6\nConstruction of overhead transmission lines on steel towers for 132kV and higher voltages Amendment 1, 1996 to Issue 2, 1986\n43-8\nOverhead line clearances Amendment 2, 1996 to Issue 2, 1988\n43-11\n400kV steel tower transmission lines—specification L.12 (2 x 700 mm2 AAAC per phase) (1 x 425 mm2 AAAC earthwire) Amendment 1, 1996 to Issue 1, 1984\n43-96\nFasteners and washers for wood pole overhead lines Corrigendum, 1996 to Amendment 1, 1995 to Issue 2, 1986\n43-97\nSteel supports for single circuit 132kV overhead lines Amendment 1, 1996 to Issue 1, 1990\n43-99\nLimits and measurement of radio noise from cap and pin insulators Issue 1, 1997\n43-100\nConductor tensions and sags Issue 1, 1997\n43-101\nLine and earth conductors Issue 1, 1997\n43-102\nInsulators and fittings for 132kV lines Issue 1, 1997\n43-104\nSpacers for twin and quad line conductors Issue 1, 1997\n43-105\nBi-metal connectors for line conductors Issue 1, 1997\n43-106\nTubular jumpers and earthing bars for twin line conductors Issue 1, 1997\n43-107\nSelection of earthwire changeover towers for 400kV lines with 4 x 61/.125 in s.c.a. conductors per phase Issue 1, 1997\n43-108\nSuspension clamps for conductors Issue 1, 1997\n43-109\nBonds for earth conductors Issue 1, 1997\n43-110\nTension joints (mid span joints) for conductors Issue 1, 1997\n43-111\nNon-tension joints and tee connectors for conductors Issue 1, 1997\n43-112\nRepair sleeves for conductors Issue 1, 1997\n43-113\nVibration dampers for conductors Issue 1, 1997\n43-114\nAnchor clamps for conductors Issue 1, 1997\n43-115\nInsulators and fittings for 275kV lines Issue 1, 1997\n43-116\nInsulators and fittings for 400kV lines Issue 1, 1997\n43-117\nInstallation of aluminium current carrying overhead line conductor fittings Issue 1, 1997\n43-118\nOverhead line erection and maintenance equipment (earthed working) Issue 1, 1997\n43-119\nDesign and use of temporary scaffold guards Issue 1, 1997\n48-5\nEnvironmental test requirements for protection relays and systems Issue 1, 1996\n50-9\nEquipment for work on cables under induced voltage conditions Issue 1, 1997\n97-1\nSpecial backfill materials for cable installations Issue 1, 1997\n98-1\nSurface preparation and coating systems for new plant and equipment Issue 2, 1997\nC97\nCode of Practice on the marking of high-voltage cable routes 1997\nG56/1\nArrangements for access by EA Member Company staff to Railtrack Infrastucture 1996\nG75\nRecommendations for the connection of embedded generating plant to Public Electricity Suppliers' distribution systems above 20kV or with outputs over 5MW 1996\nG76\nGuide to the Audit and Certification of Suppliers' Quality Management Systems\nPart 1: Guide to the Organisation and Operation of Accredited Third Party Certification Bodies 1996\nPart 2 (a): Guide to the audit of the Quality Management Systems of Suppliers of High Voltage Switchgear 1996\nPart 2 (b): Guide to the Audit of the Quality Management Systems of Suppliers of Low Voltage and High Voltage Cable and Accessories 1996\nPart 2 (c): Guide to the Audit of the Quality Management Systems of Suppliers of High Voltage Transformers and Reactors 1997\nL43\nDesign and use of skycradles at line crossings of motorways, other major roads and railways 1997\nP25/1\nThe short-circuit characterisitcs of Public Electricity Suppliers' low voltage distribution networks and the co-ordination of overcurrent protective devices on 230V single phase supplies up to 100A 1996\nTELE.2\nInstallation of optical cabling in hazardous areas: Overhead power lines 1997\nEB/BT.2\nConditions for BT and Public Electricity Suppliers' joint use of poles 1996",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/1998/1395/schedule",
    "retrieved_at": "2026-10-29T11:27:41.500079+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}