Schedule STANDARDS
| 09-19 | Synthetic aromatic hydrocarbon insulating fluid for use in fluid-filled pressure-assisted cables up to 400kV operating voltage Issue 2, 1996 |
| 09-22 | Protection of cable installations against the effects of fire Issue 1, 1997 |
| 12-4 | Terminating equipment for pilot cables subject to induced transient voltages exceeding 650V rms Amendment 1, 1996 to Issue 1, 1973 |
| 12-25 | Cable trays Issue 1, 1997 |
| 35-17 | Class X current transformers Issue 1, 1996 |
| 41-26 | Distribution switchgear for service up to 36kV (cable connected) Amendment 3, 1997 to Issue 1, 1991 |
| 41-27 | Outdoor distribution switchgear for service up to 36kV (overhead conductor connected) Amendment 3, 1997 to Issue 1, 1991 |
| 43-2 | Design of steel tower overhead transmission lines at 132kV and higher voltages Amendment 1, 1996 to Issue 1, 1972 |
| 43-3 | Design of lattice steel transmission towers for overhead lines at 132kV and higher voltages Amendment 1, 1996 to Issue 1, 1972 |
| 43-6 | Construction of overhead transmission lines on steel towers for 132kV and higher voltages Amendment 1, 1996 to Issue 2, 1986 |
| 43-8 | Overhead line clearances Amendment 2, 1996 to Issue 2, 1988 |
| 43-11 | 400kV steel tower transmission lines -specification L. 12 (2 x 700mm2 AAAC per phase) (1 x 425mm2 AAAC earthwire) Amendment 1, 1996 to Issue 1, 1984 |
| 43-96 | Fasteners and washers for wood pole overhead lines Corrigendum, 1996 to Amendment 1, 1995 to Issue 2, 1986 |
| 43-97 | Steel supports for single circuit 132kV overhead lines Amendment 1, 1996 to Issue 1, 1990 |
| 43-99 | Limits and measurement of radio noise from cap and pin insulators Issue 1, 1997 |
| 43-100 | Conductor tensions and sags Issue 1, 1997 |
| 43-101 | Line and earth conductors Issue 1, 1997 |
| 43-102 | Insulators and fittings for 132kV lines Issue 1, 1997 |
| 43-104 | Spacers for twin and quad line conductors Issue 1, 1997 |
| 43-105 | Bi-metal connectors for line conductors Issue 1, 1997 |
| 43-106 | Tubular jumpers and earthing bars for twin line conductors Issue 1, 1997 |
| 43-107 | Selection of earthwire changeover towers for 400kV lines with 4 x 61/.125 in s.c.a. conductors per phase Issue 1, 1997 |
| 43-108 | Suspension clamps for conductors Issue 1, 1997 |
| 43-109 | Bonds for earth conductors Issue 1, 1997 |
| 43-110 | Tension joints (mid span joints) for conductors Issue 1, 1997 |
| 43-111 | Non-tension joints and tee connectors for conductors Issue 1, 1997 |
| 43-112 | Repair sleeves for conductors Issue 1, 1997 |
| 43-113 | Vibration dampers for conductors Issue 1, 1997 |
| 43-114 | Anchor clamps for conductors Issue 1, 1997 |
| 43-115 | Insulators and fittings for 275kV lines Issue 1, 1997 |
| 43-116 | Insulators and fittings for 400kV lines Issue 1, 1997 |
| 43-117 | Installation of aluminium current carrying overhead line conductor fittings Issue 1, 1997 |
| 43-118 | Overhead line erection and maintenance equipment (earthed working) Issue 1, 1997 |
| 43-119 | Design and use of temporary scaffold guards Issue 1, 1997 |
| 48-5 | Environmental test requirements for protection relays and systems Issue 1, 1996 |
| 50-9 | Equipment for work on cables under induced voltage conditions Issue 1, 1997 |
| 97-1 | Special backfill materials for cable installations Issue 1, 1997 |
| 98-1 | Surface preparation and coating systems for new plant and equipment Issue 2, 1997 |
| C97 | Code of Practice on the marking of high-voltage cable routes 1997 |
| G56/1 | Arrangements for access by EA Member Company staff to Railtrack Infrastructure 1996 |
| G75 | Recommendations for the connection of embedded generating plant to Public Electricity Suppliers' distribution systems above 20kV or with outputs over 5MW 1996 |
| G76 | Guide to the Audit and Certification of Suppliers' Quality Management Systems Part 1: Guide to the Organisation and Operation of Accredited Third Party Certification Bodies 1996 Part 2 (a): Guide to the audit of the Quality Management Systems of Suppliers of High Voltage Switchgear 1996 Part 2 (b): Guide to the Audit of the Quality Management Systems of Suppliers of Low Voltage and High Voltage Cable and Accessories 1996 Part 2 (c): Guide to the Audit of the Quality Management Systems of Suppliers of High Voltage Transformers and Reactors 1997 |
| L43 | Design and use of skycradles at line crossings of motorways, other major roads and railways 1997 |
| P25/1 | The short-circuit characteristics of Public Electricity Suppliers' low voltage distribution networks and the co-ordination of overcurrent protective devices on 230V single phase supplies up to 100A 1996 |
| TELE.2 | Installation of optical cabling in hazardous areas: Overhead power lines 1997 |
| EB/BT.2 | Conditions for BT and Public Electricity Suppliers' joint use of poles 1996 |