# The River Humber Gas Pipeline Replacement Order 2016, Part 4: Environmental statement

Extent: E+W+S

Table 5
Document
Date
Document Title
6.1
15 April 2015
Introduction
6.2
15 April 2015
Scheme Description
6.3
15 April 2015
Design Iterations and Alternatives Considered
6.3.1
15 April 2015
Appendix 3.1 Strategic Options Report
6.3.2
15 April 2015
Appendix 3.2 Alternatives - Route Corridor Investigation Study
6.4
15 April 2015
Appendix 3.3 Alternatives - Crossing Options Report A
6.4.1
15 April 2015
EIA Methodology and Construction Environmental Management
6.4.2
15 April 2015
Appendix 4.1 PINS Scoping Opinion Comments
6.5
15 April 2015
Air Quality
6.5.1
15 April 2015
Appendix 5.1 Dust risk Assessment
6.6
15 April 2015
Cultural Heritage
6.6.1
15 April 2015
Appendix 6.1 Desk-Based Assessment
6.6.2
15 April 2015
Appendix 6.2 Aerial Photograph Analysis at Paull
6.6.3
15 April 2015
Appendix 6.3 Geophysical Surveys Undertaken at Paull
6.6.4
15 April 2015
Appendix 6.4 Geophysical surveys Undertaken at Goxhill
6.6.5
15 April 2015
Appendix 6.5 Southend Bypass Geophysical Survey
6.7
15 April 2015
Ecology and Nature Conservation
6.7.1
15 April 2015
Appendix 7.1 Technical Appendix
6.7.2
15 April 2015
Appendix 7.2 Potentially Excepted Information
6.8
15 April 2015
Update Deadline 8?
6.8.1
15 April 2015
Geology and Soils
6.8.2
15 April 2015
Appendix 8.1 Environmental Agency and Local Authority Responses
6.8.2
15 April 2015
Appendix 8.2 Desk Study Report Plan 1
6.8.2
15 April 2015
Appendix 8.2 Desk Study Report Plan 2
6.8.3.2
15 April 2015
Appendix 8.2 Desk Study Report Plan 3
6.8.3
15 April 2015
Appendix 8.3 Ground Investigation Report
6.8.3.1
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 1
6.8.3.2
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 2
6.8.3.3
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 3
6.8.3.4
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 4
6.8.3.5
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 5
6.8.3.6
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 6
6.8.3.7
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 7
6.8.3.8
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 8
6.8.3.9
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 9
6.8.3.10
12 October 2015
Appendix 8.3 Addendum - Phase I Test Results and Factual Report Volume 10
6.8.3.11
02 November 2015
Appendix 8.3 Addendum - Phase II Test Results and Factual Report
6.8.4
15 April 2015
Appendix 8.4 Paull Holme Strays Investigation Report
6.8.5
15 April 2015
Appendix 8.5 Chalk Report
6.8.6
15 April 2015
Appendix 8.6 Geophysical Survey Report 1
6.8.6
15 April 2015
Appendix 8.6 Geophysical Survey Report 2
6.8.6
15 April 2015
Appendix 8.6 Geophysical Survey Report 3
6.8.7
15 April 2015
Appendix 8.7 Information Relating to Stoneledge Field Investigation
6.8.8
15 April 2015
Appendix 8.8 Responses from Lincolnshire Environmental Records Centre East Yorkshire RIGS Group
6.8.9
15 April 2015
Appendix 8.9 Unexploded Ordnance Report
6.9
15 April 2015
Landscape and Visual Amenity
6.10
15 April 2015
Noise and Vibration
6.10.1
15 April 2015
Appendix 10.1 Noise Monitoring Installation Sheets and Time History
6.10.2
15 April 2015
Appendix 10.2 Noise Model Inputs
6.10.3
15 April 2015
Appendix 10.3 Noise Model Outputs
6.11
15 April 2015
Socio-Economics and Land Use
6.11.1
15 April 2015
Appendix 11.1 Agricultural Land Survey
6.12
15 April 2015
Traffic and Transport
6.13
15 April 2015
Water Resources
6.13.1
15 April 2015
Appendix 13.1 Water Framework Directive Assessment
6.13.2A
13 January 2016
Appendix 13.2 Initial Site Water Management Plan
6.13.2.1
13 January 2016
Comparison between Initial Site Water Management Plan versions 6.13.2 and 6.13.2A
16.13.3
15 April 2015
Appendix 13.3 Hydrogeological Impact Assessment
6.13.3.1
12 October 2015
Appendix 13.3 Addendum - Mini-Pumping Test Results and Factual Report
6.13.3.2
12 October 2015
Appendix 13.3 Addendum Report to Hydrogeological Impact Assessment
6.14
15 April 2015
Cumulative Effects
6.15
15 April 2015
Cumulative Effects
6.16
15 April 2015
Screening Opinions
6.17
15 April 2015
Scoping Opinion
6.18
15 April 2015
EIA Regulations Publicity Requirements
6.19
15 April 2015
Non-Technical Summary

---
Source: https://www.legislation.gov.uk/uksi/2016/853/schedule/2/part/4 (the official version)
Page: https://openlegislation.uk/river-humber-gas-pipeline-replacement-order-2016/schedule-2/part-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

